Gary Moves Forward With 11 New Homes Plan

The City of Gary is advancing a plan to build 11 homes on vacant, city-owned lots near Borman Square Park.

Updated on Nov. 11, 2026 in Construction

Isometric editorial illustration of a row of eleven small wooden home frames on cleared lots, in oxblood, teal, and cream, evoking a city-led housing build-out.
The City of Gary is moving forward with plans to build 11 new homes on vacant city-owned lots near Borman Square Park, with developer applications due Monday. AI Illustration. Upload story photo >

Live Poll

Do you trust Gary's local government to deliver good new housing for residents?

The City of Gary is moving forward with plans to build 11 new homes near Borman Square Park, with developer applications due Monday. The homes will be built on vacant, city-owned lots in the 800 block of Monroe Street under the Gary First Pilot Program.

Why it matters

The approach gives the city greater control over the design and development of housing on city-owned property. Developers must work within preapproved designs and guidelines the city has provided.

The pilot covers 11 homes on vacant, city-owned lots in the 800 block of Monroe Street, with approved models ranging from accessory dwelling units to side-by-side duplexes. Which developers will be selected, and the project's timeline and cost, have not been disclosed.

The players

City of Gary

Gary is a city in Lake County, Indiana, on the southern shore of Lake Michigan, known for its steel industry history and ongoing urban redevelopment efforts.

University of Notre Dame

The University of Notre Dame is a private Catholic research university in Notre Dame, Indiana, founded in 1842 and known for its academic programs and athletics.

Carriage House Studios

Carriage House Studios is a design firm that partnered with the city on the architectural planning for the Gary First Pilot Program.

The details

The city developed the plan in partnership with the University of Notre Dame and Carriage House Studios and is providing prospective construction firms with preapproved architectural renderings, floor plans, design standards, and development guidelines. Approved housing models include accessory dwelling units, cottages, carriage houses, small, medium and standard-sized homes, stacked duplexes, and side-by-side duplexes.

Timeline

  1. November 9, 2026: The city moved forward with plans to build 11 homes, and the deadline for developers to submit applications was set for the same day.

Market Landscape

The Gary First Pilot Program applies a preapproved design model to city-owned land, a departure from Gary's past reliance on developer-led infill on scattered vacant parcels. The pilot positions the city to set its own design standards for small-scale housing rather than leaving them to individual builders.

Residents near Borman Square Park and the Monroe Street block will see new housing built on lots that are currently vacant. Construction firms must submit applications by the deadline to be considered for the project.

The takeaway

Cities that retain design control over public land can shape what housing gets built on it. Watching which firms are selected will show how the pilot's standards play out in practice.

Further reading

For more on local building projects, see Construction coverage across the Gary area.

Live Poll

Do you trust Gary's local government to deliver good new housing for residents?