Eastbound I-80 Lanes in Joliet Close to Repair Bridge
IDOT's final weekend closure between Houbolt Road and Richards Street begins 10 p.m. Friday, Nov. 20 with full reopening expected Monday.
Updated on Nov. 18, 2026 in Car Maintenance

The Illinois Department of Transportation will close eastbound lanes of Interstate 80 between Houbolt Road and Richards Street in Joliet starting at 10 p.m. Friday, Nov. 20, to perform bridge deck repairs and pavement patching. At least one eastbound lane will remain open at all times, and westbound lanes are not affected.
Why it matters
The closure is the last of five planned weekend closures on the corridor, and the work is scheduled over multiple weekends to reduce unplanned emergency closures. Repairs are intended to keep the structures in acceptable condition while the larger I-80 corridor improvement project proceeds. Drivers in Joliet should expect heavy congestion, and local streets cannot accommodate heavy or wide trucks.
IDOT is closing eastbound I-80 lanes between Houbolt Road and Richards Street from 10 p.m. Friday, Nov. 20, with at least one eastbound lane open throughout. This is the last of five weekend closures planned for the corridor, and the notice does not address how traffic will be rerouted beyond the lane configuration.
The players
Illinois Department of Transportation (IDOT)
The state agency responsible for planning, building, and maintaining Illinois highways, including Interstate 80 and its bridges, and the body directing this weekend's lane closures.
The details
IDOT is performing bridge deck repairs and pavement patching on Interstate 80 in Joliet, with work scheduled across several weekends to minimize unplanned closures. The westbound direction is not affected by the work, and the agency has indicated that repairs keep the structures serviceable while the broader corridor improvement is under construction.
Timeline
Friday, Nov. 20, 10 p.m.: Eastbound lane closures begin between Houbolt Road and Richards Street.
Monday, Nov. 23, 5 a.m.: All lanes are expected to reopen.
Seasonal Patterns
Scheduling this bridge work across multiple November weekends places repairs in the colder late-fall window, when the planned closures avoid the heavier summer construction season on the corridor. The timing reflects IDOT's effort to complete the sequence before winter weather further limits pavement patching options.
Drivers using eastbound I-80 in Joliet should plan for slower travel and heavy congestion from Friday night through early Monday morning. Commuters with heavy or wide vehicles should use an alternate route, since local streets cannot accommodate those trucks.
The takeaway
Build extra time into weekend trips on eastbound I-80 through Joliet until the final closure ends Monday morning. Checking current traffic conditions before leaving can help you avoid the worst of the backups.
What happens next
All eastbound lanes are expected to reopen by 5 a.m. Monday, Nov. 23, after the final weekend of closures.
Further reading
For more on keeping your vehicle ready for winter road conditions, explore our Car Maintenance guides.
Source note: This article includes information reported by 1340 WJOL.






