Evanston to Host Lead Pipe Replacement Open House

The city's public meeting on its citywide lead service line replacement program will be held at Robert Crown Community Center on Dec. 8.

Updated on Nov. 20, 2026 in Industry

Open street trench with exposed clay and gravel and a single copper-colored water pipe resting on the bed, beside a curb and grass verge on an overcast day.
Evanston will hold a Dec. 8 open house at Robert Crown Community Center on its program to replace all more than 9,000 lead service lines by 2044. AI Illustration. Upload story photo >

Live Poll

Do you trust Evanston to replace lead service lines on schedule?

The City of Evanston will host an open house on its citywide Lead Service Line Replacement Program on Dec. 8, 2026, from 4:30 to 6:30 p.m. at Robert Crown Community Center, with exhibit boards and a continuously running presentation. The city plans to replace all more than 9,000 lead service lines in Evanston by 2044.

Why it matters

Evanston residents with lead service lines can learn how the full replacement program works at no cost to eligible property owners. The city says its drinking water already complies with federal standards, and a corrosion inhibitor has kept water from contacting lead pipes since 1992.

The city has replaced 1,113 lead service lines since 2022 out of more than 9,000 it plans to replace by 2044. The Evanston water plant serves about 488,000 residents and 61,000 businesses across 10 surrounding communities, distributing 17 billion gallons in 2025.

The players

City of Evanston

Evanston is a city in Cook County, Illinois, on the shore of Lake Michigan, and it operates the third-largest water plant in the state.

The details

The open house features exhibit boards in English and a presentation available online in Spanish, Simplified Chinese, Hindi and Haitian Creole, and is accessible to people with disabilities. Attendees may arrive any time between 4:30 and 6:30 p.m., and project team members will answer questions.

Timeline

  1. 2022: The city began counting its replacement of lead service lines.

  2. 1992: A corrosion inhibitor began preventing water from contacting lead pipes.

  3. September 2026: Construction in the current phase began in the Second and Fifth wards.

  4. Dec. 8, 2026: Open house held from 4:30 to 6:30 p.m. at Robert Crown Community Center.

  5. 2044: Target year for replacing all more than 9,000 lead service lines.

Utility Context

Evanston's program operates under Illinois requirements for lead service line inventories and replacements, placing the city's 2044 target within the state's broader effort to remove lead pipes from public water systems. The city's Lake Michigan source and its treatment operations shape how it sequences work across its wards.

Eligible property owners can have their full lead service line replaced at no cost through the city program. Residents can attend the open house or visit the program website to learn how replacement will reach their property.

The takeaway

Property owners with lead service lines should check the city program's details before work reaches their ward. Attending the Dec. 8 open house is one way to ask project staff directly about timing and eligibility.

What happens next

Construction in the current phase continues into 2027 in the Second and Fifth wards, and the program then moves to other wards until all properties are completed.

Further reading

Explore more on Utilities coverage for Evanston residents tracking water infrastructure projects.

More information

Visit the Lead service line replacement program website for details on the citywide program.

Source note: This article includes information reported by Evanston RoundTable.

Live Poll

Do you trust Evanston to replace lead service lines on schedule?