Northwestern Residents Face Construction Odors in Bobb Hall
Undergraduate students are advised to keep windows closed as renovations continue at the adjoining McCulloch Hall.
Updated on Oct. 28, 2026 in Home Renovation

Live Poll
Do you believe university housing renovations justify the temporary disruptions to student living conditions?
As of October 2026, students residing in the Bobb-McCulloch Hall complex are experiencing construction odors linked to ongoing facility upgrades. The university has directed residents to keep windows closed during the day to mitigate the entry of smells produced by new roof materials.
Why it matters
Northwestern University is currently executing a multiyear renovation project to modernize the residential complex, which houses more than 400 undergraduates. The upgrades include new mechanical and plumbing systems, alongside central air conditioning, intended to address the building infrastructure.
The renovation project for the 1955-built residential complex includes installing a new roof and elevators. Noisy construction work is restricted to begin no earlier than 9 a.m. daily.
The players
Northwestern University
This private research institution in Evanston oversees the maintenance and renovation of its campus housing facilities.
Residential Services
This university department manages on-campus housing logistics and communicates operational changes, including construction schedules, to student residents.
The details
The asphalt-like odors stem from materials used to install a new water vapor barrier and insulation on the roof of McCulloch Hall. While the current phase impacts nearby residents, the university has established specific operational constraints to balance the construction timeline with student living requirements.
Timeline
1955: Bobb and McCulloch halls were originally constructed.
1980: The two buildings were physically connected by the university.
2025-26 academic year: Bobb Hall underwent significant renovations.
October 2026: Residents reported ongoing construction odors.
August 2027: The full complex renovation is scheduled for completion.
Culture Shift
The ongoing work follows the 2016 reported mold incident in Bobb Hall, marking a shift toward comprehensive infrastructure modernization. This renovation project aims to move the aging 1955 structure into alignment with current university living standards.
Students living in the complex must maintain closed windows throughout the day to prevent construction-related odors from entering their rooms. Residents can expect to hear loud construction noise only after 9 a.m. as work continues through the coming weeks.
The takeaway
Maintaining clear communication regarding building maintenance helps minimize disruptions for undergraduate residents in older facilities. Students should adhere to university guidance on window ventilation to ensure their living environment remains manageable during active construction.
Further reading
Learn more about local updates regarding Home Renovation projects impacting the Evanston community.
Source note: This article includes information reported by The Daily Northwestern.
Live Poll
Do you believe university housing renovations justify the temporary disruptions to student living conditions?










