GDOT to Close Two I-285 Lanes Tuesday Night

Crews will repair a bridge joint over the Chattahoochee River in Smyrna after a Saturday separation temporarily shut down southbound traffic.

Updated on Nov. 24, 2026 in Transportation

Wide view of a concrete highway bridge deck with an exposed expansion joint crossing the lanes, a wooded river valley beyond the railing under overcast daylight.
The Georgia Department of Transportation will close two southbound lanes of I-285 between South Cobb Drive and Botton Road Tuesday night to repair a bridge joint over the Chattahoochee River in Smyrna. AI Illustration. Upload story photo >

The Georgia Department of Transportation will close two righthand southbound lanes on I-285 between South Cobb Drive and Botton Road on Tuesday night for concrete repairs to a bridge deck joint in Smyrna. The work follows a bridge separation on Saturday that temporarily shut down the southbound interstate.

Why it matters

The bridge separation disrupted a major commuter corridor in the Smyrna area, and the scheduled repair will affect southbound drivers during overnight hours. Officials report there is no structural danger to the bridge, though it remains unclear whether additional permanent repairs will be needed.

Lane closures began at approximately 4:25 p.m. Saturday and traffic resumed just after 9 p.m., while Tuesday's scheduled closure runs from 8 p.m. to 6 a.m. Officials have not said whether further permanent repairs will be required beyond the concrete work.

The players

Georgia Department of Transportation (GDOT)

The state agency responsible for maintaining Georgia's highways and bridges, including the I-285 bridge over the Chattahoochee River in Smyrna.

The details

A problem with the header joints caused the bridge over the Chattahoochee River to separate on Saturday afternoon, prompting GDOT crews to apply temporary asphalt to a bridge deck joint. GDOT will close two righthand southbound lanes between South Cobb Drive and Botton Road to make the concrete repair.

Timeline

  1. Saturday afternoon (November 21, 2026): Bridge separation shuts down southbound I-285 and lane closures begin at approximately 4:25 p.m.

  2. Saturday, just after 9 p.m.: Traffic resumes along the bridge.

  3. Monday, 8 p.m. to Tuesday, 6 a.m.: GDOT closes two lefthand lanes for repairs.

  4. Tuesday, 8 p.m. to Wednesday, 6 a.m.: Scheduled closure of two southbound righthand lanes for concrete repairs.

Roadmap

GDOT's weekend patch used temporary asphalt to stabilize a failing header joint, and Tuesday's planned concrete repair is intended to outlast that stopgap. The sequence reflects a common maintenance pattern in which short-term fixes buy time before a more durable repair is completed on a heavily traveled interstate.

Southbound I-285 drivers near Smyrna should expect lane closures between South Cobb Drive and Botton Road on Tuesday night from 8 p.m. to 6 a.m. Commuters may want to plan alternate routes or allow extra travel time during the overnight repair window.

The takeaway

Officials say the bridge poses no structural danger, but drivers should check traffic conditions before traveling southbound on I-285 in Smyrna on Tuesday night. Planning ahead can reduce delays during the scheduled overnight closure.

What happens next

GDOT is scheduled to close two southbound righthand lanes between South Cobb Drive and Botton Road from 8 p.m. Tuesday to 6 a.m. Wednesday to complete the concrete repair.

Further reading

For more on how road projects shape regional commuting, see Transportation coverage on Smyrna's infrastructure.

Source note: This article includes information reported by MDJOnline.