Macon Plant Adds 1.7 MW of Solar Power

Cherry Street Energy built solar systems at YKK USA's Macon facilities at no capital cost to the company.

Updated on Nov. 18, 2026 in Energy

Macon Plant Adds 1.7 MW of Solar Power

Live Poll

Do you think more local manufacturers should switch to solar power?

Cherry Street Energy installed 1.7 megawatts of solar across the PF4 and TMP buildings at YKK USA's Macon site, using 3,597 panels. The Greater Macon Chamber of Commerce held a ribbon-cutting event for the project.

Why it matters

The installation is expected to generate nearly 2.7 million kilowatt-hours of electricity each year and avoid nearly 1,800 metric tons of carbon emissions annually. For Macon, it shows how a long-established local manufacturer is adding renewable generation on its own sites.

The 1.7 megawatt system uses 3,597 panels and is expected to generate about 2.7 million kilowatt-hours annually, equal to the power for roughly 220 homes. Actual performance against these projections has not yet been reported.

The players

YKK USA

The U.S. arm of the Japanese zipper and fastener manufacturer YKK, which has operated in Macon for about 50 years.

Cherry Street Energy

A solar developer that financed, built and now operates the systems at the YKK Macon site under a fixed-rate power arrangement.

Greater Macon Chamber of Commerce

The regional business organization that hosted the ribbon-cutting event for the solar project and has promoted local business development.

The details

Cherry Street Energy financed and built the solar systems, and will operate and maintain them at no capital cost to YKK. YKK pays a fixed rate for the electricity generated, and power produced on-site is used before drawing from the grid.

Timeline

  1. Chamber and community leaders visited YKK's international headquarters last year.

  2. YKK completed a solar project in Anaheim, California in 2016.

  3. The Macon solar ribbon-cutting event was reported on November 18, 2026.

Market Landscape

YKK's 2016 solar project in Anaheim, California set a precedent for the company's use of third-party-financed on-site solar. The Macon installation extends that model to a second U.S. plant, with Cherry Street Energy carrying the capital cost in both cases.

For Macon residents, the project adds local renewable generation without a direct charge to YKK for installation or upkeep. The fixed-rate structure means the plant's electricity costs are set by contract rather than by market rate changes over the agreement period.

The takeaway

Third-party solar financing lets manufacturers add on-site renewable power without upfront capital spending. Other plants considering similar arrangements can compare fixed-rate terms against their own grid costs.

Further reading

For more on regional power projects, explore Energy coverage from across the state.

Source note: This article includes information reported by WGXA.

Live Poll

Do you think more local manufacturers should switch to solar power?