GDOT Closes I-285 Lanes for Westside Restoration

All lanes of I-285 between South Fulton Parkway and Camp Creek Parkway close from Friday night through Monday morning, ahead of Thanksgiving travel.

Updated on Nov. 20, 2026 in Industry

GDOT Closes I-285 Lanes for Westside Restoration

Live Poll

Would you change your Thanksgiving driving plans because of Atlanta highway closures?

The Georgia Department of Transportation is closing all lanes of I-285 between South Fulton Parkway and Camp Creek Parkway from 7 p.m. Friday, November 20, until 5 a.m. Monday, November 23, 2026. Transportation officials recommend alternate routes via I-85, I-75, and the Atlanta Connector.

Why it matters

The four-day closure falls just before the busiest Thanksgiving travel period, when most holiday travelers in the Atlanta area are expected to drive rather than fly. Drivers on the city's southwest side will need to plan detours around the closed section.

The closure runs roughly 84 hours, and AAA projects that 90% of Thanksgiving travelers will drive rather than fly or use another mode. The extraction does not report how much traffic volume the detour routes are expected to absorb.

The players

Georgia Department of Transportation (GDOT)

GDOT is the state agency responsible for planning, building, and maintaining Georgia's state highway system, including interstates such as I-285.

AAA

AAA is a national motor club and travel organization that publishes annual holiday travel forecasts based on booking and driving data.

The details

Traffic from the closed section will be redirected north via exit 5A on Lanford Parkway to I-85 or I-75 and the Atlanta Connector, while traffic from the south will exit at exit 61 and rejoin I-285 at Lanford Parkway. The closure is part of an ongoing westside restoration project.

Timeline

  1. November 20, 2026, 7 p.m.: I-285 closure begins between South Fulton and Camp Creek Parkways.

  2. November 23, 2026, 5 a.m.: I-285 closure is lifted.

  3. November 26, 2026: The busiest Thanksgiving travel days begin, Tuesday and Wednesday before the holiday.

  4. December 4-7, 2026: The next scheduled I-285 partial closure.

Seasonal Patterns

AAA's Thanksgiving forecast consistently finds that most holiday travelers drive, and this year's 90% driving share puts pressure on road networks already strained by the holiday. The I-16 corridor linking Atlanta to Savannah is projected to become Georgia's busiest roadway, with traffic expected to rise 40% and travel times exceeding five hours.

Drivers heading through southwest Atlanta should plan to use I-85, I-75, or the Atlanta Connector during the November 20-23 closure. Travelers flying into Hartsfield-Jackson via Camp Creek Parkway should allow extra time for alternate routing.

The takeaway

Checking the closure schedule before leaving can prevent long delays on Thanksgiving weekend. Building in extra travel time for detours is the most practical step for Atlanta-area drivers this holiday.

What happens next

The next scheduled I-285 partial closure runs December 4 through December 7, 2026, with the lanes between South Fulton Parkway and Camp Creek Parkway again affected.

Further reading

For more on regional road conditions, see Transportation coverage across the Atlanta area.

Source note: This article includes information reported by Augusta Chronicle.

Live Poll

Would you change your Thanksgiving driving plans because of Atlanta highway closures?