Georgia DOT Awards Taylor’s Ridge Road Repair Contract
The state has contracted for a multi-million dollar slope stabilization project to secure a section of U.S. Highway 27.
Updated on Oct. 30, 2026 in Construction

Live Poll
Do you trust your local transportation department to manage highway construction budgets effectively?
In September 2026, the Georgia Department of Transportation awarded a construction contract for Phase II of the Taylor's Ridge slope repair project. The work aims to address long-standing roadway instability on a portion of U.S. Highway 27 in Chattooga County.
Why it matters
This project addresses ongoing ground shifts that have caused the road to settle and move since 2019. By installing a permanently anchored retaining wall, the state intends to resolve the underlying hillside instability that necessitated temporary repairs in the past.
The awarded contract for the slope repair is valued at $7.4 million, notably higher than the $4.08 million initial low bid. The construction zone covers two-tenths of a mile of U.S. Highway 27.
The players
Georgia Department of Transportation
This state agency is responsible for planning, building, and maintaining Georgia's transportation infrastructure.
The details
The scope of work includes building a retaining wall, grading, roadway repairs, erosion-control measures, and fencing. Engineers will perform a detailed stability analysis to support the design, which maintains the highway's existing two-lane configuration.
Timeline
2019: U.S. Highway 27 experienced significant roadway movement.
2021: The Georgia Department of Transportation completed the first phase of stabilization work.
September 2026: The state awarded the Phase II repair contract.
October 19, 2026: GDOT publicly announced the contract award.
November 17, 2026: Construction is scheduled to begin.
Market Landscape
This project follows the pattern of the 2021 Taylor's Ridge stabilization phase by continuing efforts to mitigate geological movement on state transit routes. It represents a significant commitment to maintaining rural infrastructure connectivity between local towns.
Motorists who regularly travel U.S. Highway 27 between Summerville and Rome should anticipate potential construction activity in the area starting in mid-November. The project aims to improve road safety and reliability for local commuters.
The takeaway
Ongoing slope repairs serve as a critical measure to keep essential mountain highways safe and passable. Drivers in areas prone to geological shifts should monitor official updates to stay informed of potential traffic pattern changes during long-term construction projects.
What happens next
Construction is expected to conclude by the project completion deadline of November 30, 2027.
Further reading
For more information on state infrastructure updates, visit Georgia Construction.
Source note: This article includes information reported by Chattooga1180.
Live Poll
Do you trust your local transportation department to manage highway construction budgets effectively?










