WM to Hold Steel-Raising for $88M Tampa Plant

The Dec. 2 ceremony marks a construction milestone for a recycling facility on North 35th Street.

Updated on Nov. 26, 2026 in Industry

Half-built steel frame of an industrial recycling building rising over a cleared lot, with a crane lifting a steel beam under a bright blue sky.
WM will hold a steel-raising ceremony Dec. 2 for its $88 million recycling plant under construction on North 35th Street in East Ybor, Tampa. AI Illustration. Upload story photo >

WM will hold a steel-raising ceremony for its $88 million recycling plant in East Ybor, Tampa, on December 2, 2026, at 10 a.m. at the construction site on North 35th Street. Tampa Mayor Jane Castor and WM Florida Area Vice President David Myhan are scheduled to attend.

Why it matters

The 110,000-square-foot facility is tied to a 15-year processing contract WM signed with Hillsborough County and is planned to replace an existing plant the state has described as aging. The project reflects WM's broader push to expand recycling processing capacity in Florida.

The facility is listed at 220,000 tons per year by Tampa Bay Business & Wealth, while equipment maker CP Group gives 228,000 tons per year, against 90,000 tons handled by the current plant in 2023. The 50-tons-per-hour dual-line system sits within a 15-year county contract, and WM's total recycling infrastructure investment across 39 facilities is $1.4 billion.

The players

WM

WM is a Houston-based waste management and recycling company that reported $25.2 billion in 2025 operating revenue and has invested $1.4 billion in recycling infrastructure since 2022.

Jane Castor

Jane Castor is the mayor of Tampa, Florida, and is scheduled to attend the steel-raising ceremony.

David Myhan

David Myhan is WM's Florida Area Vice President and is scheduled to attend the steel-raising ceremony.

The details

The new plant will be built beside WM's existing material recovery facility and will feature two processing line systems and 17 optical sorters supplied by CP Group. Gilbane Building Co., based in Providence, Rhode Island, is the general contractor, and once open the new facility is expected to take over recycling operations from the current building, which is expected to remain on the property.

Timeline

  1. Feb. 19, 2026: WM held a ribbon-cutting at its Pembroke Pines recycling plant.

  2. Spring 2026: Construction of the East Ybor facility is expected to begin.

  3. Dec. 2, 2026: Steel-raising ceremony at 10 a.m. at the North 35th Street site.

  4. Late 2027: The East Ybor recycling plant is targeted to open.

Market Landscape

The East Ybor project fits within the Hillsborough County processing contract WM signed for a 15-year term, which anchors the facility's long-term volume. By replacing an existing plant the state has described as aging, WM is expanding its Florida recycling capacity to meet that contractual commitment.

For Tampa-area residents and businesses that send recyclables through Hillsborough County's system, the new plant will determine how that material is processed once it opens in late 2027. The county's 15-year processing contract with WM means the handling of local recycling is set to remain under this arrangement for the foreseeable future.

The takeaway

The steel-raising on December 2 is a visible checkpoint in a project that will shape how Tampa-area recyclables are processed for years, so tracking construction milestones offers a clear view of when the new capacity arrives.

What happens next

The steel-raising ceremony takes place on December 2, 2026, at 10 a.m. at the North 35th Street site, and the East Ybor recycling plant is targeted to open in late 2027.

Further reading

For more on local building projects, explore Construction coverage across the Tampa area.

Source note: This article includes information reported by Hoodline.