Pinellas to Replace San Martin Bridge to Ramp Up Plans
Pinellas County plans a wider replacement for the 1962 San Martin Boulevard Bridge, with construction expected to start in late 2027.
Updated on Nov. 18, 2026 in Lifestyle

Live Poll
Should your county spend $31 million to replace an aging bridge?
Pinellas County plans to replace the San Martin Boulevard Bridge across Riviera Bay in St. Petersburg with a wider structure that adds sidewalks and bicycle lanes. The county has applied for $24.2 million in federal funding as the estimated cost has risen from $20.4 million to $31.4 million.
Why it matters
The current bridge, built in 1962, is nearing the end of its useful life and has no sidewalks or bicycle lanes, according to the county. Replacing it will affect drivers, pedestrians and cyclists who rely on the crossing between St. Petersburg neighborhoods.
The county has already received $850,000 toward the project and applied for $24.2 million in federal funding. If the grant is approved, federal money would cover about 80% of construction costs, while the county would pay the remaining $6.3 million, and the outcome of the application has not yet been decided.
The players
Pinellas County
Pinellas County is a Florida county on the Gulf Coast that includes St. Petersburg and manages county infrastructure such as major bridges.
The details
The new bridge will be built just east of the current crossing, between Tallahassee Drive and Weedon Drive, so crews can work beside the existing span. Drivers will be able to keep using San Martin Boulevard during construction because engineers found they would need to raise sections of the roadway and add structural supports to maintain traffic.
Timeline
2016: The county first studied repairing or replacing the bridge.
1962: The current San Martin Boulevard Bridge was built.
Late 2027: Construction is expected to begin.
Summer 2030: The project is expected to be finished.
Roadmap
The county first studied repairing or replacing the bridge in 2016, and the project has since moved forward as its estimated cost rose from $20.4 million to $31.4 million. The plan reflects how aging local bridges are increasingly being rebuilt with federal support rather than repaired in place.
Drivers and cyclists who cross Riviera Bay on San Martin Boulevard will keep access during construction because the new bridge is being built alongside the existing one. The wider structure is planned to add sidewalks and bicycle lanes that the current bridge lacks.
The takeaway
Residents who regularly use the San Martin Boulevard crossing should expect the bridge to remain open through the planned construction period, with the new span set to be finished by summer 2030. Watch for updates on the federal grant decision, since it determines how much the county must pay.
Further reading
For related local projects, see Home Renovation coverage for St. Petersburg.
Source note: This article includes information reported by Tampa Bay Business & Wealth.
Live Poll
Should your county spend $31 million to replace an aging bridge?






