Palm Bay Reopens Flood-Damaged Port Malabar Blvd
Cathcart Construction Company restored the roadway in two weeks after historic November 2 flooding damaged the route.
Updated on Nov. 15, 2026 in Safety

Live Poll
Do you trust your local government to recover quickly after disasters?
The City of Palm Bay has reopened Port Malabar Boulevard after historic flooding on November 2 caused extensive damage to the roadway. The City's contractor, Cathcart Construction Company, completed repairs and fully restored the roadway in two weeks.
Why it matters
Port Malabar Boulevard is an important connection for residents, and its closure disrupted daily travel while the flood damage was repaired. The reopening restores that route for the Palm Bay community.
Cathcart Construction Company completed repairs to Port Malabar Boulevard within two weeks of the November 2 flooding. The source does not report the repair cost or the full scope of damage beyond the Boundary Canal crossing.
The players
City of Palm Bay
The City of Palm Bay is a municipality in Brevard County, Florida, responsible for maintaining local roads and infrastructure within its borders.
Cathcart Construction Company
Cathcart Construction Company is the City's contractor that carried out the repairs to Port Malabar Boulevard after the flooding.
The details
Historic flooding on November 2 caused significant damage at the Boundary Canal crossing on Port Malabar Boulevard, forcing the roadway to close. City staff and contractors worked to restore the critical infrastructure, and the roadway has now been fully restored.
Timeline
November 2, 2026: Historic flooding damaged Port Malabar Boulevard.
Two weeks after the flooding: Cathcart Construction Company completed repairs and restored the roadway.
November 16, 2026, 12 p.m.: The City will hold a ribbon-cutting ceremony to celebrate the reopening.
Seasonal Patterns
The November 2 flooding that closed Port Malabar Boulevard was a historic event for Palm Bay, and the two-week repair timeline restored the road at the Boundary Canal crossing. The source does not compare this flood to prior records for the region.
Drivers who use Port Malabar Boulevard can again travel the route now that repairs are complete. Residents should follow any posted traffic guidance at the Boundary Canal crossing as the roadway returns to normal use.
The takeaway
Restoring Port Malabar Boulevard within two weeks shows how quickly local infrastructure can recover after a major flood when repairs are prioritized. Residents who rely on the route can resume normal travel as the city marks the reopening.
What happens next
The City of Palm Bay will hold a ribbon-cutting ceremony for the reopened Port Malabar Boulevard on November 16, 2026, at 12 p.m.
Further reading
For more on road safety and emergency preparedness, see Safety coverage for Palm Bay.
Live Poll
Do you trust your local government to recover quickly after disasters?






