FDOT Studies Orange Blossom Trail and Ace Road
The Florida Department of Transportation will examine the Orlando intersection after residents raised speeding and median safety concerns.
Updated on Nov. 9, 2026 in Sex Life

Live Poll
Do you trust local transportation officials to fix dangerous roads after complaints?
The Florida Department of Transportation will study the Orange Blossom Trail and Ace Road intersection north of downtown Orlando over 60 to 90 days. The study follows concerns from Orlando resident Don Brown about speeding traffic, truck traffic and median safety.
Why it matters
The intersection sits on a stretch of Orange Blossom Trail that MetroPlan Orlando lists in its High Injury Network, and three deadly crashes occurred in the area from 2021 to 2025. The study will determine what improvements, if any, are needed for Orlando drivers using this corridor.
Three deadly crashes were recorded in the area between 2021 and 2025, and the FDOT study will run 60 to 90 days. The study's findings on needed improvements have not yet been determined.
The players
Florida Department of Transportation
The state agency responsible for the state highway system, which is conducting the intersection study.
MetroPlan Orlando
The metropolitan planning organization for the Orlando region that lists this stretch of Orange Blossom Trail in its High Injury Network.
Don Brown
An Orlando resident who raised concerns about speeding traffic, truck traffic and median safety at the intersection.
The details
The study will examine driver behavior, road conditions and crash data at the intersection, where the median opening at Ace Road allows turns from multiple directions. Drivers have a long stretch to pick up speed on Orange Blossom Trail between Silver Star Road and Lee Road, and some leaving a nearby warehouse make a slight left into the median.
Timeline
Three deadly crashes occurred in the area between 2021 and 2025.
The FDOT study of the intersection will run for 60 to 90 days.
Seasonal Patterns
The intersection's inclusion in MetroPlan Orlando's High Injury Network marks it as a corridor with a documented pattern of severe crashes. The FDOT study places this specific Orlando intersection within that broader regional safety record.
Orlando drivers using Orange Blossom Trail near Lake Fairview and Ace Road may see the outcome of the study affect how they navigate the intersection. The study will assess speeding, truck traffic and median access at this location.
The takeaway
Drivers near Orange Blossom Trail and Ace Road should expect the study to shape any changes at the intersection, so staying alert to speeds and turning traffic in the median remains practical.
What happens next
The Florida Department of Transportation's 60 to 90 day study of the Orange Blossom Trail and Ace Road intersection will determine what improvements, if any, are needed.
Further reading
Explore more on Sex Life in Orlando.
Source note: This article includes information reported by News 13.
Live Poll
Do you trust local transportation officials to fix dangerous roads after complaints?










