Dolphin Expressway Closures to Disrupt Miami Weekend

Overnight lane and ramp closures and delayed Metrorail openings will affect Miami commuters on November 20-22, 2026 while crews install bridge beams.

Updated on Nov. 20, 2026 in Construction

Elevated concrete expressway viaduct spanning a rail track as a steel bridge beam is lowered by crane under bright overcast daylight, with palm-lined city blocks in the distance.
Crews working overnight on State Road 836 in Miami will close the Dolphin Expressway from Friday, November 20, into Sunday morning while installing bridge beams over Metrorail tracks. AI Illustration. Upload story photo >

Eastbound and westbound State Road 836 (Dolphin Expressway) will be closed overnight near Northwest 17th and 12th avenues from Friday, November 20, 2026, into Sunday morning. Three Metrorail stations will not open until noon on Saturday and Sunday, and free shuttle buses will run between Government Center and Santa Clara stations.

Why it matters

Crews need the late Metrorail openings and expressway closures to safely install bridge beams above the rail tracks. Miami drivers and transit riders should plan alternate routes and travel times for the weekend.

Eastbound State Road 836 closes at Northwest 17th Avenue from 10 p.m. Friday to 10 a.m. Saturday, and again Saturday night to Sunday morning, while westbound lanes close fully from 11 p.m. to 8 a.m. The source does not say whether the closure windows will change if work runs behind schedule.

The players

Miami-Dade County

Miami-Dade County is the county government overseeing public works, transit and road projects across the Miami metropolitan area.

Florida Department of Transportation

The Florida Department of Transportation manages state roads, including State Road 836 (Dolphin Expressway), and coordinates closures for construction work.

The details

Workers are installing bridge beams above the Metrorail track, which requires the expressway closures. Eastbound drivers can exit at Northwest 17th Avenue and detour via Northwest Seventh Street and Northwest 12th Avenue, while westbound drivers exit at Northwest 12th Avenue and detour via Northwest Seventh Street and Northwest 17th Avenue.

Timeline

  1. Friday, November 20, 2026, 10 p.m.: Eastbound and westbound Dolphin closures begin.

  2. Saturday, November 21, 2026, 10 a.m.: Eastbound closure ends; Metrorail stations open at noon.

  3. Saturday, November 21, 2026, 6 a.m. to 10 a.m.: Drawbridges on West Flagler and Southwest First streets open on the hour and half-hour.

  4. Saturday night to Sunday, November 22, 2026, morning: Eastbound Dolphin closes again at Northwest 17th Avenue.

  5. Sunday, November 22, 2026: Three Metrorail stations open at noon and drawbridge schedules change.

Market Landscape

The Dolphin Expressway work is part of Miami-Dade's continuing effort to coordinate road and rail construction along State Road 836 without fully halting Metrorail service. The overnight sequencing reflects the constraints of building directly above active transit tracks in a dense urban corridor.

Drivers using the Dolphin Expressway should expect detours through Northwest Seventh Street and plan longer travel times overnight Friday and Saturday. Metrorail riders should expect the three listed stations to open at noon on both Saturday and Sunday, with free shuttles running between Government Center and Santa Clara.

The takeaway

Plan weekend trips around the overnight Dolphin closures and the delayed noon Metrorail openings, and use the free Government Center to Santa Clara shuttles if rail service is limited.

Further reading

Find more on local projects in the Construction section.

Source note: This article includes information reported by Miami Herald.