Cabot/Koppers Superfund Site Remediation Has Begun
The EPA is starting a new phase of cleanup at the former wood-treating site in Gainesville.
Updated on Oct. 9, 2026 in Home Renovation

Live Poll
Do you trust the EPA to manage environmental cleanup projects transparently in your local community?
The Environmental Protection Agency has announced that the next phase of remediation at the Cabot/Koppers Superfund Site in Gainesville involves extensive tree clearing and soil removal. This effort aims to stabilize the area following nearly a century of industrial activity.
Why it matters
The project is essential for containing long-standing contaminants, including dioxin and benzene, left behind from wood-treating operations that spanned from 1916 to 2009. The work ensures the site adheres to strict commercial and industrial safety standards.
The remediation plan requires the construction of a 5,300-foot cut-off wall that will extend 65 feet deep to contain groundwater. An impermeable cover will also be installed to prevent groundwater from running through the contaminated area.
The players
Environmental Protection Agency
The federal agency is responsible for overseeing the cleanup and long-term management of hazardous waste sites across the United States.
Gainesville City Commission
The local governing body represents the interests of Gainesville residents and works with federal agencies on regional environmental and urban development projects.
The details
Workers will replace an existing stormwater ditch with a new piping system designed to route water around the newly installed cut-off wall. Due to the history of chemical contamination, a restrictive covenant currently prohibits any residential use of the site.
Timeline
Wood-treating operations occurred at the site from 1916 to 2009.
The EPA provided a remediation update to the Gainesville City Commission on October 8, 2026.
Construction of the cut-off wall is scheduled to begin in mid-October 2026.
A public open house will be held on October 21, 2026, from 5 p.m. to 7 p.m.
Culture Shift
This project reflects a broader national transition toward reclaiming legacy industrial land for modern use under the protocols of the Comprehensive Environmental Response, Compensation, and Liability Act. The cleanup effort aligns with standard federal efforts to neutralize hazardous sites.
Residents should be aware that the remediation work involves significant site activity including heavy machinery and tree clearing. The project secures the area to prevent future health risks associated with the long-standing industrial soil contamination.
The takeaway
Large-scale environmental restoration projects are essential for ensuring that formerly industrial land can be safely managed for the future. Residents are encouraged to attend the upcoming public open house to ask officials directly about the construction timeline.
What happens next
A public open house is scheduled for October 21, 2026, at 200 NW 23rd Avenue to provide residents with more information about the remediation process.
Further reading
Learn more about local land development and environmental standards on our Home Renovation page.
Live Poll
Do you trust the EPA to manage environmental cleanup projects transparently in your local community?










