Legacy Harbour Marina Has Reopened in Fort Myers
The marina resumed operations for seasonal and short-term visitors after four years of restoration following Hurricane Ian.
Updated on Sept. 25, 2026 in Cruises

Live Poll
Do you feel local businesses in your area have successfully recovered from past natural disasters?
Legacy Harbour Marina has officially reopened its slips for guest use in Fort Myers. The waterfront facility returned to service after a four-year recovery effort triggered by the destruction of Hurricane Ian.
Why it matters
The reopening marks a significant milestone for the city's River District, which faced extensive infrastructure challenges after the 2022 storm. The facility's return restores a key maritime access point along the Caloosahatchee River.
The marina recovery journey spanned 4 years of salvage and cleaning operations following the damage from Hurricane Ian. While the slips have reopened, the onsite construction yard remains unchanged.
The players
Legacy Harbour Marina
This waterfront facility serves as a primary docking location for boaters in the Fort Myers River District.
The details
The restoration process required a massive cleanup effort that included salvaging sunken vessels directly from the harbor floor. While the slips are currently open for visitors, the property continues to undergo a phased recovery, with the onsite restaurant expected to return later this year.
Timeline
Hurricane Ian caused significant damage to the marina in September 2022.
Legacy Harbour Marina reopened its slips in September 2026.
The marina restaurant is expected to open in December 2026.
Travel Outlook
This reopening reflects the broader long-term reconstruction cycle of waterfront tourism assets along the Caloosahatchee River. It signals a move toward stabilization for regional boating infrastructure following the massive disruption caused by the 2022 impact of Hurricane Ian.
Boaters seeking seasonal or short-term slips in the Fort Myers area can now resume booking directly at the marina. Guests should plan for a limited amenity experience until the onsite restaurant opens in December.
The takeaway
The successful restoration of the marina highlights the lengthy timeline required for specialized coastal infrastructure to recover from major storm events. Travelers should verify current available services before docking to ensure their specific logistical needs can be met.
What happens next
The restaurant on the property is scheduled to resume operations in December 2026.
Further reading
Learn more about local maritime activity in the Cruises section.
Source note: This article includes information reported by WBBH.
Live Poll
Do you feel local businesses in your area have successfully recovered from past natural disasters?










