Florida Selected DeSoto Bridge Replacement Plan
The state revealed a $916 million design to upgrade the bridge connecting Bradenton and Palmetto.
Updated on Sept. 25, 2026 in Car Types

Live Poll
Do you support prioritizing elevated express lanes to improve traffic flow in your area?
The Florida Department of Transportation has selected a replacement plan for the DeSoto Bridge, featuring a significant expansion in lane capacity. The proposal aims to alleviate traffic congestion for the two cities connected by the structure.
Why it matters
The project seeks to improve safety and manage rising traffic demands by separating through-traffic from local vehicles. With 47% of motorists currently passing through the area without stopping, the new design intends to streamline regional mobility.
The proposed $916 million design increases bridge capacity to six standard traffic lanes and adds two elevated express lanes. The current bridge supports four lanes total.
The players
Florida Department of Transportation
This state agency is responsible for the construction and maintenance of Florida's transportation infrastructure.
The details
The plan includes elevated express lanes designed to carry drivers over downtown Bradenton and Palmetto, alongside shared-use paths for pedestrians and cyclists. Officials hope the infrastructure will better accommodate commuters while maintaining transit flow for regional travelers.
Timeline
September 25, 2026: FDOT announced the preferred bridge replacement plan.
Roadmap
This project reflects a broader shift toward integrating elevated express lanes to manage high volumes of regional through-traffic in growing urban corridors. It positions Florida transportation planners to better separate local city traffic from state highway transit.
Drivers can expect significant changes to their daily commuting routes through Bradenton and Palmetto if the construction proceeds. The addition of express lanes will likely alter travel times for those bypassing the city centers.
The takeaway
Commuters should monitor future public hearings to see if the no-build option remains on the table. Residents who frequently traverse the corridor should prepare for long-term construction impacts should the design move forward.
What happens next
The project will move into the formal design phase if the current study is officially accepted by the state.
Further reading
Learn more about the latest infrastructure projects in the Florida Car Types section.
Live Poll
Do you support prioritizing elevated express lanes to improve traffic flow in your area?









