East Main Street Ramp to I-91 South Closes

The on-ramp will close Tuesday and remain shut until November 30, 2027, as part of a multi-phase interchange project in Meriden.

Updated on Nov. 29, 2026 in Transportation

Empty concrete highway on-ramp curving through a wooded New England valley under overcast daylight, with a closed barrier across the lane.
The Connecticut Department of Transportation will close the East Main Street on-ramp to southbound Interstate 91 in Meriden starting Tuesday, until November 30, 2027. AI Illustration. Upload story photo >

Live Poll

Do you think local road construction is improving things in your area?

The Connecticut Department of Transportation will close the East Main Street on-ramp to Interstate-91 southbound in Meriden starting Tuesday, with the closure scheduled to last until November 30, 2027. The closure is part of the I-91/I-691/Route 15 interchange project, and motorists are being directed to two detour routes.

Why it matters

The long closure will change how drivers in Meriden reach southbound I-91 for well over a year. The work is part of a larger reconfiguration of the interchange that is scheduled to be completed in November 2030.

The Phase 3 interchange project was awarded to O&G Industries for $262,642,583.27 on March 5, 2026. Completion is scheduled for November 2030, though weather delays and unforeseeable conditions could modify that timeline.

The players

Connecticut Department of Transportation

The state agency responsible for planning, building and maintaining Connecticut's highways, bridges and transit systems, and the body directing this closure.

O&G Industries

A Connecticut-based construction and infrastructure contractor that was awarded the Phase 3 I-91/I-691/Route 15 interchange project.

The details

The East Main Street on-ramp to I-91 southbound closes starting Tuesday. Eastbound drivers on East Main Street can use Research Parkway and Route 68/Barnes Road, while westbound drivers can take Broad Street (Route 5) and the I-691 eastbound ramp, then Exit 1B onto Route 15 southbound and Exit 64A onto I-91 southbound. The on-ramp from East Main Street to Route 15 southbound remains open.

Timeline

  1. March 5, 2026: O&G Industries was awarded the interchange project contract.

  2. Tuesday (week of November 29, 2026): The East Main Street on-ramp to I-91 southbound closes.

  3. November 30, 2027: The on-ramp closure is scheduled to end.

  4. November 2030: The interchange project is scheduled for completion.

Market Landscape

The closure is a stage in the multi-phase rebuilding of the I-91/I-691/Route 15 interchange in Meriden, a project whose Phase 3 work now moves to a contractor selected in March 2026. The construction timeline runs through November 2030, placing this ramp closure in the middle of a long reconfiguration of the regional highway network.

Drivers who regularly use the East Main Street on-ramp to southbound I-91 will need to follow the posted detours for more than a year. Eastbound and westbound drivers have separate alternate routes, so commuters should plan extra travel time before the closure begins.

The takeaway

Drivers planning commutes through Meriden should map the detour routes before the closure starts, since the ramp will stay closed for more than a year while the interchange work continues.

What happens next

The on-ramp closure begins Tuesday and is scheduled to remain in effect until November 30, 2027, with the full interchange project slated for completion in November 2030.

Further reading

For more on regional road work and infrastructure, see Transportation coverage for Meriden.

Source note: This article includes information reported by Hartfort Courant.

Live Poll

Do you think local road construction is improving things in your area?