State Commits $2.5M to Repave Windsor Locks Canal Trail

Suffield is leading the 4.5-mile repaving project, with construction expected to begin in 2027.

Updated on Nov. 19, 2026 in Politics

Photograph of a worn stone-dust canal trail beside still water under bare trees, with a fresh strip of dark asphalt laid along one section.
Connecticut has committed more than $2.5 million to repave the 4.5-mile canal trail in Windsor Locks, with Suffield leading a project set to begin construction in 2027. AI Illustration. Upload story photo >

Live Poll

Do you support state spending on repaving local trails in your community?

Connecticut has committed more than $2.5 million to repave the 4.5-mile canal trail in Windsor Locks. The town of Suffield applied for the funding through the state's Local Transportation Capital Improvement Program, and the Connecticut Department of Transportation accepted the application.

Why it matters

The project replaces deteriorating pavement with asphalt, a change from the stone-dust surface Suffield originally proposed, which the state transportation department required. The new pavement is expected to be safer for families, seniors and people with mobility challenges using the trail across Connecticut.

The state committed more than $2.5 million to repave the full 4.5-mile state park trail, replacing deteriorating pavement with asphalt. Whether the town has secured the extra funding needed to cover the asphalt change remains unconfirmed.

The players

Connecticut Department of Transportation

The state agency that accepted Suffield's funding application and required asphalt in place of the originally proposed stone-dust surface.

Tami Zawistowski

A Connecticut state representative who announced the state's funding commitment for the Windsor Locks canal trail repaving.

Friends of the Windsor Locks Canal State Park

A volunteer group that has cleared brush and removed invasive plants along the canal trail.

The details

Suffield applied to the state's Local Transportation Capital Improvement Program, and the Connecticut Department of Transportation accepted the application. Earlier plans called for a stone-dust surface, but the transportation department required asphalt, prompting the town to seek more money for the change.

Timeline

  1. October 18: The Hartford Line train station in downtown Windsor Locks opened for CTrail and Amtrak service.

  2. September: Suffield's First Selectman published an update on the canal trail project.

  3. November 19, 2026: Rep. Tami Zawistowski announced the state funding commitment.

  4. 2027: Construction on the canal trail repaving is expected to begin.

Industry Dynamics

The project was funded through Connecticut's Local Transportation Capital Improvement Program, the state mechanism that channels transportation capital dollars to municipalities. The transportation department's insistence on asphalt over stone dust reflects the state's standards for trail surfaces receiving program funding.

Residents who walk, bike or use mobility aids on the canal trail will eventually get smoother asphalt pavement in place of the deteriorating surface. The project's timeline and the town's need for additional funding determine when that improvement arrives.

The takeaway

Towns seeking state transportation money should expect design requirements, such as surface materials, to shape both cost and approval. Keeping project scope aligned with state standards from the start can prevent costly changes later.

What happens next

Construction on the canal trail repaving is expected to begin in 2027.

Further reading

For more on how towns pursue state money for local projects, see City Hall coverage across Connecticut.

Source note: This article includes information reported by Patch.

Live Poll

Do you support state spending on repaving local trails in your community?