Stockton Upgrades Tenmile Slough Levee Amid Flood Risk

San Joaquin Area Flood Control Agency has upgraded a critically deficient levee section protecting over a quarter of a million people.

Updated on Nov. 17, 2026 in Safety

Wide photo-realistic view of an earthen levee with rock armoring along a still slough, a gravel access road on its crest, and flat farmland beyond under pale sky.
The San Joaquin Area Flood Control Agency upgraded a critically deficient Tenmile Slough levee in Stockton, protecting more than 250,000 people as part of the $1.95 billion Lower San Joaquin River Project. AI Illustration. Upload story photo >

Live Poll

Do you trust your local government to keep your home safe from flooding?

The San Joaquin Area Flood Control Agency upgraded a Tenmile Slough levee in Stockton, a section identified as one of the most critically deficient in the Central Valley levee system. The work is part of the $1.95 billion Lower San Joaquin River Project.

Why it matters

The surrounding area sits within a 200-year flood plain, and the Tenmile Slough levee protects over a quarter of a million people. The project was prioritized because of the number of residents and homes that could be affected if the section failed.

The Tenmile Slough levee protects over a quarter of a million people within a 200-year flood plain, and the agency reports that about 23 miles of levees are targeted for improvement over 10 to 15 years. Numerous agricultural levees in the area are not known to meet current standards, and their upgrade timeline was not specified.

The players

San Joaquin Area Flood Control Agency

The local agency responsible for flood control infrastructure in the San Joaquin area, overseeing the levee upgrades along Tenmile Slough.

The details

The upgrade includes a seepage wall designed to help prevent water from moving underneath the levee and a rock face to protect against wave action, along with an access road. Major floods in 1997 exposed significant flood risks in the San Joaquin River Basin, shaping the priority given to this section.

Timeline

  1. 1997: Major floods exposed significant flood risks in the San Joaquin River Basin.

  2. Next 10 to 15 years: The agency plans to improve about 23 miles of levees.

Seasonal Patterns

The upgrade follows the flood risks identified after the 1997 floods in the San Joaquin River Basin, which exposed the vulnerability of the Central Valley levee system. The work is now being prepared for the winter 2026-27 El Niño season, which affects precipitation in Northern California.

Residents in north and central Stockton should be aware that the levee system is being upgraded to reduce flood risk, with improved protection expected for approximately 122,000 residents and $28.7 billion in property. Those living within the 200-year flood plain should stay informed about local flood preparedness as improvements proceed.

The takeaway

Flood protection depends on the condition of every levee segment, including agricultural levees that may not meet current standards. Staying informed about local improvement timelines helps residents understand their long-term flood risk.

What happens next

The agency plans to improve about 23 miles of levees over the next 10 to 15 years, and the upgraded Tenmile Slough levee is being prepared for the winter 2026-27 El Niño season.

Further reading

Explore more local coverage in our Safety section for context on flood protection and emergency preparedness.

Live Poll

Do you trust your local government to keep your home safe from flooding?