Developer Proposes 59-Unit Housing at 2188 The Alameda

Adobe Services and Allied Housing seek approval for a six-story affordable project near downtown San Jose.

Updated on Nov. 9, 2026 in Remote Work

Partially built mid-rise residential structure with exposed concrete floors and steel columns under a clear blue sky, with a distant crane silhouette.
Adobe Services and Allied Housing have proposed a 59-unit affordable housing project at 2188 The Alameda in San Jose, replacing a hotel that houses 27 transitional units. AI Illustration. Upload story photo >

Live Poll

Do you support building new affordable housing that replaces an existing hotel in your city?

Adobe Services and Allied Housing have proposed Casa De Novo, a 59-residence affordable housing development at 2188 The Alameda in San Jose's Rose Garden district. The plan would demolish a hotel structure that currently houses 27 transitional housing units.

Why it matters

The project would add permanent supportive housing in a neighborhood near downtown San Jose while removing existing transitional units. The development team is seeking city planning staff approval under provisions of Assembly Bill 2162 that streamline review for supportive housing.

The proposal would increase the site from 27 transitional units to 59 residences, with a unit mix of 10 studios, 39 one-bedroom units and 10 two-bedroom units across a six-story building. City planning staff have not yet approved the plan, and the timeline for the second phase has not been set.

The players

Adobe Services

Adobe Services is a San Jose-based nonprofit housing developer that partnered on the Casa De Novo proposal.

Allied Housing

Allied Housing is a nonprofit affordable housing developer based in the Bay Area that co-developed the project.

The details

The development would be built in two phases, with phase one covering the 59 units and demolition of the existing hotel structure. Referrals to the transitional units will be discontinued before construction, so the building will be vacated without tenant displacement.

Timeline

  1. Referrals to existing transitional units will be discontinued before construction begins.

  2. Phase one will consist of the 59 units and hotel demolition.

  3. A separate application for phase two demolition and construction will be submitted later.

Remote Work

The project relies on the streamlined approval pathway created by Assembly Bill 2162 for supportive housing, which applies to developments of this type across California. Its unit mix of studios, one-bedrooms and two-bedrooms reflects the housing needs of residents who want to live near downtown jobs, including those who work remotely from home.

If approved, the project would add 59 affordable residences near downtown San Jose and remove 27 transitional units from the site. Current transitional-unit residents will be referred elsewhere before construction begins.

The takeaway

Affordable housing projects in San Jose are increasingly using state streamlining laws to move faster through city review. Residents interested in the outcome can track the project through city planning records as the review proceeds.

Further reading

For more on how housing and work patterns intersect in the Bay Area, see Remote Work.

Source note: This article includes information reported by Silicon Valley.

Live Poll

Do you support building new affordable housing that replaces an existing hotel in your city?