Prado Group Files Permits for 261 Units

Permits cover two apartment buildings and nine single-family houses on Block B of the former CPMC campus in Presidio Heights.

Updated on Nov. 27, 2026 in Industry

Bold flat-color editorial illustration of two tall residential blocks above a row of nine small house silhouettes stepping up a hillside, in navy, cream, and red.
Prado Group filed building permits for 261 units on Block B of the former CPMC campus at 3700 California Avenue, with construction estimated at just over $130 million. AI Illustration. Upload story photo >

Live Poll

Do you support building more housing in your San Francisco neighborhood?

Prado Group has filed building permits for 261 units on Block B of the former CPMC campus at 3700 California Avenue. The permits cover two eight-story apartment buildings and nine single-family houses, with construction estimated at just over $130 million.

Why it matters

The filing advances a project that will add more than 400 units across three blocks in San Francisco, including 74 assisted-living and memory-care units. No timeline for the start of work has been shared.

Block B is estimated at just over $130 million in construction costs, and building B1 is designed for 214 units while building B2 is designed for 36 apartments. The estimate excludes some development costs, and the timing of work has not been disclosed.

The players

Prado Group

Prado Group is a real estate developer that acquired the plans for the CPMC campus site and filed the Block B permits.

Sutter Health

Sutter Health is a nonprofit health system that sold the former CPMC campus plans to Prado Group.

The details

Building B1 is designed to read as seven distinct structures from California and Maple streets through historicized facades, setbacks and terraces, above a three-story basement garage. Each of the nine single-family houses is a four-story structure facing Sacramento Street. TMG Partners and Sutter Health sold the plans to Prado Group, and BDE Architecture and Handel Architects replaced Robert AM Stern Architects as the design team.

Timeline

  1. April 2024: San Francisco YIMBY reported residential capacity rising to 492 apartments.

  2. Mid-2025: Urbanize reported Prado Group seeking modifications for a 456-unit project.

  3. June 2025: San Francisco YIMBY reported project approval adding 530 housing units.

  4. November 27, 2026: Block B permit filings were reported.

Market Landscape

The Block B filing follows the 2013 sale of the former CPMC Presidio campus, when Sutter Health and California Pacific Medical Center moved hospital services out of the neighborhood. It advances a redevelopment that has grown from an earlier plan of roughly 492 apartments to more than 400 units across three blocks.

For San Francisco residents, the project would add apartments and single-family houses in Presidio Heights, with 74 assisted-living and memory-care units. Nearby residents on Sacramento, California and Maple streets should expect construction once work begins, though no timeline has been set.

The takeaway

The permit filing signals that the former CPMC campus is moving toward construction, but the lack of a start date means residents should watch for further city approvals and schedule announcements. Future housing supply in Presidio Heights depends on whether the project proceeds on its current timeline.

Further reading

Explore more San Francisco construction projects and permit activity.

Source note: This article includes information reported by Hoodline.

Live Poll

Do you support building more housing in your San Francisco neighborhood?