Shipbuilders Started Replica of 1825 Cargo Ship
Construction is underway in San Diego on a historical replica of the sailing vessel The Pilgrim.
Updated on Sept. 23, 2026 in Construction

Live Poll
Do you support prioritizing traditional craft methods to preserve local history in your community?
Shipbuilders at Driscoll shipyards on Mission Bay began constructing a replica of the 1825 cargo ship The Pilgrim. This ambitious project aims to create a floating sailing school for students and adults to learn about maritime history.
Why it matters
The project serves as a practical history class for future generations by keeping traditional maritime techniques alive. It provides a rare, hands-on opportunity to engage with historical vessel construction methods.
The construction project is currently one year into a three-year timeline, with an expected completion date in 2028. Builders are recreating the 1825 cargo ship using original techniques rather than modern blueprints.
The players
Driscoll shipyards
This is the San Diego facility where the manual construction of the historical vessel replica is taking place.
The Pilgrim
This cargo ship is the subject of the reconstruction project and originally dates back to 1825.
The details
Workers and volunteers are assembling the vessel by hand, one board at a time, guided by historical descriptions rather than formal blueprints. The ship is being built at Driscoll shipyards in Mission Bay to mirror the original vessel that once traveled from Massachusetts to California.
Timeline
1825: Original construction of the cargo ship The Pilgrim.
2025: Start of construction for The Pilgrim 3.
2028: Expected completion and launch of the ship.
Market Landscape
This project stands apart from modern industrial shipbuilding by focusing on the preservation of niche, traditional craftsmanship. It creates a unique educational market in San Diego that relies on heritage preservation rather than commercial competition.
Local residents and history enthusiasts will eventually gain access to a unique educational platform for maritime training. The project currently supports regional labor through the manual assembly efforts of volunteers and workers at the Mission Bay site.
The takeaway
Preserving maritime history requires a commitment to traditional skills that are no longer standard in the modern shipbuilding sector. This project demonstrates how historical assets can be repurposed for educational community engagement.
What happens next
The ship is scheduled for completion in 2028, at which point it will begin its transition into a functioning floating sailing school.
Further reading
Learn more about local industry developments on the San Diego Construction section page.
Source note: This article includes information reported by KSWB 5/69.
Live Poll
Do you support prioritizing traditional craft methods to preserve local history in your community?










