Menlo Park Unveils $4.4 Million Flood Park Playground

The new playground is part of an ongoing makeover of the 24-acre park, which also opened a pump track last year.

Updated on Nov. 17, 2026 in Theme Parks

Bold vector editorial illustration of a multilevel playground with slides and swinging bridges among oak trees, with a zipline cable crossing the scene.
Menlo Park opened a $4.4 million multilevel playground at Flood Park on Bay Road, part of an ongoing makeover of the 24-acre park. AI Illustration. Upload story photo >

Live Poll

Do you think your local government spends enough on public parks?

Menlo Park has unveiled a $4.4 million playground at Flood Park, a 24-acre park on Bay Road. The structure includes multilevel slides and swinging bridges and sits beside a two-track zipline.

Why it matters

The project reflects a broader push in Menlo Park to upgrade its parks with features designed for a range of ages and physical abilities. It also shows how the city is investing in nature-inspired recreation as part of a continuing park makeover.

The Flood Park playground cost $4.4 million, roughly half the $8.9 million spent on the Adventure Village playground in San Mateo. The source does not specify the funding source or the timeline for remaining park improvements.

The players

Flood Park

Flood Park is a 24-acre Menlo Park park on Bay Road between Atherton and Highway 101 that has undergone a multi-year makeover.

The details

The playground features a multilevel structure with slides and swinging bridges, and a two-track zipline is located adjacent to it. Flood Park entry and parking remain free, and the park is open from 8 a.m. to 5 p.m. with later closing times planned starting in March.

Timeline

  1. Summer 2025: Construction began on the San Mateo Adventure Village playground.

  2. 2020: Flood Park's entry fee was eliminated.

  3. Last year (2025): Flood Park opened a pump track and sports facilities.

  4. Week of November 10, 2026: The Flood Park playground was unveiled.

  5. March 2027: Flood Park's later closing times are scheduled to begin.

Travel Outlook

The Flood Park playground follows the nature-inspired design direction also seen in San Mateo's $8.9 million Adventure Village, which features an elevated boardwalk linking two woodland-themed wood structures. Both projects reflect a regional pattern of parks adding play features meant to appeal to a range of ages and physical abilities.

Visitors planning a trip to Flood Park can expect free entry and free parking, with the park open from 8 a.m. to 5 p.m. before later hours begin in March. Fitzgerald Field's off-leash dog hours run from 6 to 8 a.m. for those bringing pets.

The takeaway

Free-entry parks with new play features give families a low-cost way to spend time outdoors, so checking current hours before visiting helps plan trips around upcoming schedule changes.

Further reading

Explore more about Theme Parks in and around Menlo Park.

Live Poll

Do you think your local government spends enough on public parks?