Port Releases Draft Review for Wilmington Oil Terminal

The Port of Los Angeles seeks public feedback on Phillips 66's plan to build a new berthing facility at Berths 150-151.

Updated on Nov. 21, 2026 in Industry

Photograph-style view of a concrete wharf edge over harbor water, with bare steel pipework and low storage tanks along the far shore under overcast daylight.
The Port of Los Angeles released a draft environmental review of Phillips 66's plan to build a new berthing facility and extend its Wilmington oil terminal for up to 40 years. AI Illustration. Upload story photo >

Live Poll

Should the Port of Los Angeles approve expanding its oil terminal operations?

The Port of Los Angeles has released a Draft Environmental Impact Report for the Marine Oil Terminal and Wharf Improvements Project at Berths 148-151 in Wilmington. The report is intended to gather feedback before a Final Environmental Impact Report is prepared.

Why it matters

The project would extend marine oil terminal operations at the Port of Los Angeles for up to 40 years, with a proposed 20-year entitlement term and two optional 10-year extensions. Residents of Wilmington and the wider Los Angeles area have an opportunity to review the environmental analysis before it is finalized.

The Draft Environmental Impact Report covers Berths 148-151 and evaluates up to 40 years of continued marine oil terminal operation, against an initial proposed 20-year entitlement with two optional 10-year extensions. Final approval terms remain unresolved until the Final Environmental Impact Report is issued.

The players

Port of Los Angeles

The Port of Los Angeles is a major municipal seaport and the agency responsible for environmental review of projects on its waterfront.

Phillips 66

Phillips 66 is an American energy company with refining, midstream and marketing operations, and it operates the marine oil terminal at Berths 148-151 in Wilmington.

The details

Phillips 66 operates the terminal in Wilmington and proposes building a new berthing facility at Berths 150-151 that complies with the Marine Oil Terminal Engineering and Maintenance Standards. The existing wharf at Berths 148-149 would continue operating as a marine oil terminal during construction, then be limited to non-terminal functions such as storing equipment and mooring harbour craft. Landside piping, vapour recovery systems, support systems and tankage would also be modified and upgraded.

Timeline

  1. February 2023: Initial Study and Notice of Preparation released, starting the environmental review.

  2. November 21, 2026: Draft Environmental Impact Report released by the Port of Los Angeles.

Market Landscape

The project follows the Marine Oil Terminal Engineering and Maintenance Standards, which govern how marine oil terminals in California are built and maintained. By extending operations for up to 40 years, the proposal keeps Phillips 66's Wilmington terminal in service within that regulatory framework rather than departing from it.

Residents and businesses in Wilmington and the surrounding area can review the draft report and submit comments to the Port of Los Angeles before the Final Environmental Impact Report is issued. Operations at the Phillips 66 terminal will continue during construction at Berths 148-149, so day-to-day activity at the site is expected to persist.

The takeaway

Public review of environmental reports like this one gives Los Angeles residents a formal channel to shape how long and under what conditions a major port facility operates. Comments submitted during the draft stage can influence the final terms.

Further reading

For more on regional shipping and port infrastructure, explore Transportation coverage on Wisevoter.

Source note: This article includes information reported by Container News.

Live Poll

Should the Port of Los Angeles approve expanding its oil terminal operations?