Vincent Thomas Bridge to Close for Repairs in October
The bridge will see multiple overnight closures starting October 18, 2026, ahead of a long-term project.
Updated on Oct. 15, 2026 in Home Renovation

Live Poll
Do you feel informed enough to manage your travel plans during the upcoming Vincent Thomas Bridge closures?
Caltrans has scheduled five overnight closures for the Vincent Thomas Bridge from October 18 through October 23, 2026. These closures are required to install working platforms and structural bracing for the upcoming bridge deck replacement project.
Why it matters
The $752.8 million deck replacement project is a critical infrastructure effort to modernize the aging structure, which first opened in 1963. These initial overnight closures serve as a necessary precursor to a 16-month full bridge closure scheduled to begin in November.
The bridge re-decking project is budgeted at $752.8 million and is expected to continue through February 2028. The bridge has been in service since 1963 and requires these upgrades to remain operational.
The players
Caltrans
The California Department of Transportation is the state agency responsible for the design, construction, and maintenance of the state's highway system.
Skanska-CEC Joint Venture
This construction partnership is serving as the general contractor for the Vincent Thomas Bridge project.
The details
During the overnight periods from 10:45 p.m. to 6:45 a.m., southbound State Route 47 between Ferry Street and Harbor Boulevard will be closed. Traffic will be diverted via northbound SR-47 to SR-103 and west on Pacific Coast Highway, while the Ferry Street on-ramp remains inaccessible.
Timeline
October 18-23, 2026: Overnight closures take place from 10:45 p.m. to 6:45 a.m.
November 7, 2026: The start of a 16-month full bridge closure at midnight.
February 2028: Expected completion of the bridge re-decking project.
Culture Shift
This project represents a massive structural update to essential regional transit infrastructure built in the mid-20th century. Such overhauls are part of a broader shift toward revitalizing aging urban networks to accommodate modern safety and volume standards.
Drivers in the Los Angeles area should prepare for detours via SR-103 and Pacific Coast Highway during the overnight hours. Residents who use the bridge for daily commuting should adjust their travel schedules to account for these specific construction windows.
The takeaway
Commuters should plan for significant delays as these construction windows start to affect local traffic flow. Travelers are encouraged to utilize official detour routes to avoid congestion during the late-night closure periods.
What happens next
A 16-month full bridge closure is scheduled to begin at midnight on November 7, 2026.
Further reading
For more information on infrastructure updates, visit the Los Angeles Home Renovation section.
More information
Find project updates and detour maps on the Vincent Thomas Bridge deck replacement website.
Live Poll
Do you feel informed enough to manage your travel plans during the upcoming Vincent Thomas Bridge closures?










