Digital Realty Will Build Los Angeles Cable Station

The data center operator will partner with Assured Communications to link trans-Pacific subsea cables.

Updated on Oct. 5, 2026 in Data Centers

Isometric editorial illustration depicting a large concrete data center building on a coast with thick cables connecting from the sea.
Digital Realty will partner with Assured Communications to construct a new subsea cable landing station at its Los Angeles data center, strengthening connectivity between North America and the Asia-Pacific region. AI Illustration. Upload story photo >

Live Poll

Will major data infrastructure projects improve local connectivity for residents by 2028?

Digital Realty is planning a new cable landing station at its LAX12 data center in Los Angeles. The facility will connect subsea cables from the Asia Pacific region to terrestrial networks in North America.

Why it matters

This infrastructure project aims to strengthen digital connectivity across the Pacific, facilitating faster data transfers between North America and Asia. The landing station will provide critical power and network access for global subsea cable traffic.

The project will feature a cable landing station designed to land and power subsea cables at the LAX12 facility. It will facilitate direct connections between subsea infrastructure and various cloud providers.

The players

Digital Realty

Digital Realty is a global real estate investment trust that provides data center, colocation, and interconnection solutions.

Assured Communications

Assured Communications is a specialized firm that provides design, engineering, and construction services for telecommunications infrastructure.

LAX12

LAX12 is a specific data center facility operated by Digital Realty located in Los Angeles.

The details

Assured Communications will manage the design, engineering, and construction services for the new station. The facility is intended to act as a vital bridge, allowing subsea traffic to integrate seamlessly with existing land-based data networks.

Timeline

  1. The cable landing station is expected to begin supporting subsea cables in 2028.

The Tech Race

The construction of specialized landing stations reflects the ongoing industry effort to harden and expand critical subsea cable infrastructure. By integrating these cables directly into data centers, providers are bypassing older, slower network handoffs to achieve lower latency.

While the project targets enterprise and wholesale data traffic, users may eventually experience improved reliability and speed for digital services relying on trans-Pacific data transit. Increased network density at this facility may also attract more cloud-based services to the region.

The takeaway

Reliable high-speed global connectivity depends on physical hardware upgrades like cable landing stations to bridge the gap between oceans and land. Planning for these complex integrations often requires years of preparation before they go live.

Further reading

Learn more about the latest infrastructure trends in Data Centers.

Source note: This article includes information reported by W.

Live Poll

Will major data infrastructure projects improve local connectivity for residents by 2028?