Metro Will Close Portions of 105 Freeway This Weekend

Nightly closures on the 105 Freeway will support the ongoing transition of lanes into new ExpressLanes.

Updated on Sept. 25, 2026 in Electric Vehicles

A multi-level concrete freeway interchange at night, illuminated by intense overhead streetlights casting sharp shadows.
Metro will close portions of the 105 Freeway in Los Angeles this weekend to continue the transition of lanes into new ExpressLanes. AI Illustration. Upload story photo >

Live Poll

Do you believe expanding freeway ExpressLanes in your area helps reduce overall traffic congestion?

Metro will implement overnight closures on the eastbound 105 Freeway from Hawthorne to Crenshaw boulevards starting September 25, 2026. The project will also shutter the connector from the northbound 405 Freeway to the eastbound 105 Freeway during this time.

Why it matters

This construction is part of a broader effort to convert existing high-occupancy vehicle lanes into two dedicated ExpressLanes in each direction. The project aims to improve travel speeds and reduce congestion on local streets within South Los Angeles County.

The construction work involves converting HOV lanes into two new ExpressLanes, with completion expected by 2028. Work on this segment between Sepulveda Boulevard and Central Avenue began in 2025.

The players

Metro

Metro is the public transportation agency responsible for the operation and infrastructure of Los Angeles County's transit systems.

The details

The scheduled closures will take place from 10 p.m. Friday until 10 a.m. Saturday, and again from 10 p.m. Saturday until 10 a.m. Sunday. These disruptions are necessary to facilitate the multi-year infrastructure overhaul aimed at increasing capacity for commuters.

Timeline

  1. Construction on the project segment began in 2025.

  2. The article regarding the upcoming closures was published on September 25, 2026.

  3. Overnight freeway lane and connector closures occur from September 25-27, 2026.

  4. Completion of the current project segment is expected in 2028.

Roadmap

This project reflects a long-term industry shift toward managed lanes that prioritize traffic flow through variable tolling. It mirrors wider regional attempts to alleviate gridlock by converting traditional carpool infrastructure into technologically integrated congestion management systems.

Drivers in Los Angeles should expect significant delays on the 105 and 405 freeways during the weekend closure hours. Motorists are advised to plan alternative routes to avoid the construction zone between Hawthorne and Crenshaw boulevards.

The takeaway

Travelers should verify navigation apps before heading out this weekend to avoid the closure zone. Long-term construction remains active on this corridor through 2028, so recurring traffic patterns may shift throughout the project duration.

Further reading

Find more updates on regional transit infrastructure in the Electric Vehicles section.

Source note: This article includes information reported by My News LA.

Live Poll

Do you believe expanding freeway ExpressLanes in your area helps reduce overall traffic congestion?

Metro Will Close Portions of 105 Freeway This Weekend