Long Beach Renovated Shoreline Village Waterfront
The Long Beach destination has launched a major renovation to improve harbor views and public gathering spaces.
Updated on Oct. 7, 2026 in Openings & Closings

Live Poll
Do you support prioritizing public gathering spaces over additional commercial infrastructure in your local waterfront?
Management has begun a comprehensive renovation of the Shoreline Village waterfront destination in Long Beach. The project focuses on replacing aging wooden infrastructure and enhancing public harbor access.
Why it matters
The redevelopment addresses necessary repairs caused by years of saltwater exposure while modernizing the area to create more open public space. It marks a significant shift in the layout of the 1982-era site by removing older structures to improve sightlines.
The project preserves 90% of current buildings while adding 5,000 square feet of public space. Development plans include 80 new surface parking spots and 100 linear feet of additional boardwalk.
The players
Shoreline Village
Shoreline Village is a prominent waterfront shopping and dining destination located in the Long Beach harbor.
The details
Construction crews are replacing boardwalks, railings, and lighting, while building two new semicircular structures with stepped seating. The arcade has moved to a new location near the bike shop, and an ocean-themed projection show will be installed on the boardwalk.
Timeline
Shoreline Village first opened to the public in 1982.
The current redevelopment project was initially announced in 2023.
The annual Zombie Walk and Halloween Party is scheduled for October 17, 2026.
Visitors have until the end of 2026 to retrieve love locks from the railings.
Market Landscape
This project moves the destination away from the arcade-heavy design established in 1982 to compete with modern open-air coastal retail hubs. It marks a shift toward prioritizing high-density public gathering spaces over the traditional enclosed retail layouts.
Local visitors should note that the carousel has been permanently removed from the property. Those who have attached love locks to the railings must retrieve them by the end of 2026 before the old infrastructure is replaced.
The takeaway
The renovation demonstrates a broader trend of coastal properties prioritizing accessibility and open views over older indoor entertainment venues. Visitors planning to attend the 2026 Halloween festivities should anticipate ongoing site improvements during their visit.
Further reading
For more updates on coastal developments, explore the Openings & Closings section.
Source note: This article includes information reported by Longbeachize.
Live Poll
Do you support prioritizing public gathering spaces over additional commercial infrastructure in your local waterfront?










