Berkeley Adopts Design Standards for Ashby BART Housing

The City Council voted unanimously to set objective design rules for a 4.7-acre parking lot slated for up to 600 homes.

Updated on Nov. 25, 2026 in Politics

Isometric editorial illustration of a flat parking lot beside a rail embankment and elevated transit line, with stacked concrete blocks marking a future building footprint.
Berkeley's City Council unanimously adopted design standards on Tuesday for a 4.7-acre Ashby BART parking lot, clearing a fast-tracked review of a project for up to 600 homes. AI Illustration. Upload story photo >

Live Poll

Do you support building more apartments near BART stations in your area?

The Berkeley City Council unanimously adopted objective design standards for the west parking lot at the Ashby BART station, clearing the way for a fast-tracked review of a proposed housing project. The plan, developed by Adeline Alliance Partners, calls for up to 600 homes, with half dedicated as affordable housing.

Why it matters

The standards allow the project to move through review handled by city planning staff, a path similar to one used for a North Berkeley BART project in 2024. For residents of Berkeley, the outcome signals how transit-adjacent land may be turned into housing and commercial space.

The plan includes 25,000 square feet of new commercial space and five buildings rising six to nine stories, within a seven-story height cap set by the council in 2022. Plans for the adjacent east lot would add 174 homes, though details of the project's financing remain unclear.

The players

Adeline Alliance Partners

The development group behind the proposed mixed-use housing project on the Ashby BART west parking lot.

Berkeley City Council

The elected body of the City of Berkeley that adopted the objective design standards for the site.

BART

The Bay Area Rapid Transit district, which owns the parking lots and has agreed to enforce the design standards.

The details

The design standards govern architectural elements, plaza landscaping, and site circulation, and limit interior roads to BART maintenance vehicles and emergency responders. BART has agreed to enforce the standards, which serve as the final word on the project's height.

Timeline

  1. 2022: The City Council set a seven-story height cap for the site.

  2. 2024: BART agreed to allow the west lot development to proceed.

  3. Nov. 17, 2025: The City Council approved the design standards.

  4. 2029: The development group hopes to start construction.

Political Context

Under California's Density Bonus law, developments with affordable housing can more than double standard height limits, which makes the council's 2022 seven-story cap a meaningful constraint on the Ashby plan. The project therefore sits at the intersection of state density incentives and local control over transit-adjacent land.

For Berkeley residents, the plan would replace more than 500 parking spots with 85 spots for BART riders, changing how commuters reach the station. New housing and 25,000 square feet of commercial space would arrive in phases, with the development group hoping to begin construction in 2029.

The takeaway

Projects near transit can move faster when local standards are set in advance, but height limits and affordable-housing rules will continue to shape how much housing ultimately gets built.

Further reading

For more on local decisions shaping the city, browse City Hall coverage of Berkeley.

Source note: This article includes information reported by Berkeleyside.

Live Poll

Do you support building more apartments near BART stations in your area?