AECOM Wins Five-Year Delta Tunnel Geotechnical Contract
The engineering firm will provide geotechnical exploration and reporting services for California's proposed Delta Conveyance Project.
Updated on Nov. 20, 2026 in Utilities

AECOM has been awarded a five-year contract to provide programmatic geotechnical exploration and reporting services for the Delta Conveyance Project. The client is the Delta Conveyance Design and Construction Authority, and the contract value was not disclosed.
Why it matters
The investigations will support planning, engineering design and construction risk assessment for a large water conveyance tunnel in California's Delta region. The work will inform how the project is designed and built across Sacramento, San Joaquin, Contra Costa and Alameda counties.
The contract runs five years and covers investigations across Sacramento, San Joaquin, Contra Costa and Alameda counties, with the total dollar value not disclosed. The scope includes laboratory testing, subsurface assessment and technical reporting, while the project's broader financing and timeline remain unannounced.
The players
AECOM
AECOM is a global infrastructure consulting firm that provides engineering, design and construction management services for public and private clients.
Delta Conveyance Design and Construction Authority
The Delta Conveyance Design and Construction Authority is the California public agency responsible for planning and building the Delta Conveyance Project.
The details
The work includes large-scale geotechnical and geoenvironmental investigations, laboratory testing, engineering data development and subsurface assessment. It supports a proposed project of roughly 72.4 km (45 miles) of large-diameter tunnel connecting new Sacramento River intake facilities with infrastructure near Bethany Reservoir.
Timeline
Five-year duration of the AECOM geotechnical contract (start date not specified).
Utility Infrastructure Outlook
The contract advances the Delta Conveyance Project, the state's current effort to modernize water conveyance from the Sacramento River through the Delta. Its geotechnical data will shape the tunnel's engineering and construction risk assessment.
For California residents, the project's eventual tunnel would affect how Sacramento River water is conveyed to Southern California and the Bay Area. Ratepayers and water customers will ultimately bear the financing costs, which have not yet been disclosed in this contract.
The takeaway
Large infrastructure projects depend on years of geotechnical groundwork before construction begins. Tracking these early contracts can offer insight into a project's realistic schedule and cost.
Further reading
Explore more on utilities infrastructure for context on California's water and energy projects.
Source note: This article includes information reported by Tunnelbuilder.






