Tucson Voters Reject Utility Franchise Deal

Proposition 421, a 25-year franchise agreement with Tucson Electric Power, failed at the polls, the second such rejection in three years.

Updated on Nov. 12, 2026 in Utilities

Bold flat-color editorial illustration of a single steel transmission tower on desert ground, representing Tucson's electric utility.
Tucson voters rejected Proposition 421, a 25-year franchise deal with Tucson Electric Power, the second such rejection in three years. AI Illustration. Upload story photo >

Live Poll

Should Tucson move toward a publicly owned electric utility instead of Tucson Electric Power?

Tucson voters rejected Proposition 421, a 25-year franchise agreement with Tucson Electric Power. It is the second time in three years voters have turned down a Tucson Electric Power franchise extension.

Why it matters

Tucson Electric Power will remain the electric provider within city limits, but the rejection leaves the city's next steps on the franchise open. The state, not the city, sets electric rates, which limits how much local voters can directly influence cost.

Tucson Electric Power reports 99% reliability, and its average customer went without service for 42 minutes in 2025, figures the coalition does not dispute. The current franchise agreement expires April 1, and the proposed 25-year term was rejected by voters.

The players

Tucson Electric Power

The investor-owned electric utility serving Tucson, which will remain the electric service provider within the city.

Public Power for Tucson

A coalition urging Tucson city leaders to consider a public-owned utility as an alternative to the franchise agreement.

The details

Voters turned down Proposition 421 in last week's election. Public Power for Tucson, a coalition, argues the vote was about cost and control rather than reliability, and is urging city leaders to consider a public-owned utility.

Timeline

  1. Last week: Tucson voters reject Proposition 421.

  2. April 1: The current Tucson Electric Power franchise agreement expires.

Utility Landscape

This is the second time in three years Tucson voters have rejected a Tucson Electric Power franchise extension, following the same pattern of local resistance. Because the state sets electric rates, municipal franchise votes are one of the few local levers over the utility's future.

Tucson Electric Power will continue providing electricity to city residents regardless of the vote. Because rates are set by the state, residents' bills are not directly determined by the franchise outcome.

The takeaway

Local franchise votes can shape a utility's future governance even when the state controls its rates. Residents who want a say in service and cost should follow the city's decisions ahead of the April 1 expiration.

What happens next

The current franchise agreement expires April 1, when city leaders will decide the next steps for the franchise and whether a public utility option is viable.

Further reading

For more on the local utility landscape, see Utilities coverage for Tucson.

Source note: This article includes information reported by KVOA.

Live Poll

Should Tucson move toward a publicly owned electric utility instead of Tucson Electric Power?