Loop 101, 202 Interchange Overhaul Proposed

Maricopa Association of Governments outlines changes to a Tempe-Mesa interchange ranked among metro Phoenix's worst bottlenecks.

Updated on Nov. 25, 2026 in Business

Isometric editorial illustration of tangled concrete freeway ramps and elevated interchange structures over flat desert ground, in oxblood, teal, mustard, and cream.
The Maricopa Association of Governments has proposed overhauling the Loop 101 and Loop 202 interchange in Tempe, one of metro Phoenix's worst bottlenecks, with final recommendations due in spring 2027. AI Illustration. Upload story photo >

Live Poll

Would you support a sales tax increase to fix congested freeways near you?

The Maricopa Association of Governments has proposed an overhaul of the Loop 101 and Loop 202 interchange near the Tempe-Mesa border, one of the worst bottlenecks in metro Phoenix. Recommendations are to be finalized in spring 2027.

Why it matters

The study area carried between 156,000 and 225,000 drivers daily on average in 2025, and two-thirds of survey respondents rated congestion there as severe. Tempe commuters who use the interchange would see any eventual changes directly in their daily travel.

The study area averaged 156,000 to 225,000 daily drivers in 2025, with most collisions occurring between 2 p.m. and 6 p.m. Final recommendations and their cost are still pending.

The players

Maricopa Association of Governments

The regional planning agency for metro Phoenix that coordinates transportation and infrastructure projects across Maricopa County's cities.

The details

Crash data show rear-end collisions and sideswipes make up most incidents in the study area. Because there are no direct freeway-to-freeway HOV interchanges between Loop 101 and Loop 202, drivers make last-minute lane changes that add to congestion.

Timeline

  1. 2025: Study area recorded 156,000 to 225,000 daily drivers on average.

  2. 2025: Maricopa Association of Governments launched the interchange study.

  3. Spring 2027: Recommendations are expected to be finalized.

  4. 2031: Earliest possible start of construction.

Market Landscape

The proposed overhaul is funded through Proposition 479, a 20-year half-cent sales tax that supports regional transportation projects across metro Phoenix. Its approval shapes which interchange upgrades can move forward in the coming decades.

Tempe commuters using the Loop 101 and Loop 202 interchange should expect continued congestion until improvements are funded and built. Rear-end crashes are common during evening rush hour, so drivers should allow extra following distance between 2 p.m. and 6 p.m.

The takeaway

Tempe drivers should plan for slow evening commutes at the Loop 101 and Loop 202 interchange while long-term fixes remain in study. Leaving extra space between vehicles can reduce the risk of the rear-end crashes that dominate the area.

What happens next

Recommendations for the interchange are expected to be finalized in spring 2027, with construction possibly beginning no earlier than 2031.

Further reading

For related coverage, see Transportation in Tempe.

Source note: This article includes information reported by AZ Central.

Live Poll

Would you support a sales tax increase to fix congested freeways near you?