Jonesboro Airport Opens Longer, Stronger Runway

A 500-foot runway extension and strengthened pavement let the airport handle heavier aircraft.

Updated on Nov. 25, 2026 in Air Travel

Jonesboro Airport Opens Longer, Stronger Runway

Live Poll

Do you support using public funds to expand local airport infrastructure in your community?

Jonesboro's airport has opened a runway extended by 500 feet and strengthened to handle heavier aircraft. The project was marked by a ribbon cutting attended by U.S. Sen. John Boozman, Rep. Rick Crawford, and Mayor Harold Copenhaver.

Why it matters

The upgrades give the Jonesboro airport the capacity to accommodate larger aircraft, which opens the door to possible future jet service for the city. The work also follows an EF-3 tornado on March 28, 2020, that damaged the airport.

The runway was extended by 500 feet, with $5 million in federal funding for the expansion and $9.9 million more for strengthening the pavement. Whether the added capacity will bring commercial jet service to Jonesboro has not been determined.

The players

John Boozman

U.S. Senator from Arkansas who helped secure the federal funding for the runway upgrades.

Rick Crawford

U.S. Representative from Arkansas who attended the ribbon cutting for the runway project.

Harold Copenhaver

Mayor of Jonesboro, Arkansas, who attended the ribbon cutting for the runway project.

The details

The runway was lengthened by 500 feet and strengthened to handle heavier aircraft. Sen. John Boozman helped secure the funding for the upgrades, which were celebrated at a ribbon cutting attended by Rep. Rick Crawford and Mayor Harold Copenhaver. The fixed-base operator was damaged in the 2020 tornado and has not yet reopened.

Timeline

  1. March 28, 2020: An EF-3 tornado struck Jonesboro and damaged the airport.

  2. November 24, 2026: The longer runway was celebrated at a ribbon cutting at Jonesboro airport.

  3. Coming months: A ribbon cutting is planned to mark the reopening of the fixed-base operator.

Travel Outlook

The Jonesboro airport's runway work comes six years after the EF-3 tornado of March 28, 2020, damaged the facility. The upgrade positions the airport to handle heavier aircraft as it recovers from that storm.

Travelers flying through Jonesboro may eventually see larger aircraft and possible jet service as the longer runway comes into use. The extraction does not confirm specific routes or schedules, so passengers should check with the airport for current flight options.

The takeaway

Upgrades that lengthen and strengthen a runway can expand what an airport is able to serve, even years after storm damage. Readers following Jonesboro's air service should watch for the upcoming fixed-base operator reopening as a sign of further recovery.

What happens next

A ribbon cutting is planned in the coming months to mark the reopening of the airport's fixed-base operator.

Further reading

For more on how airports like this one expand their service, see Air Travel coverage.

Source note: This article includes information reported by Kait8.

Live Poll

Do you support using public funds to expand local airport infrastructure in your community?