AI Data Centers Compete With Factories for Power

Data centers used about 4.4% of U.S. electricity in 2023 and could reach as much as 12% by 2028, straining grids in several regions.

Updated on Nov. 27, 2026 in Data Centers

AI Data Centers Compete With Factories for Power

Live Poll

Do you expect your electricity bills to rise as data centers expand?

Construction of AI data centers is booming in the Southeast, Southwest, and Midwest, where they compete with U.S. manufacturing for limited electricity. Data centers consumed about 4.4% of U.S. electricity in 2023.

Why it matters

Competition for power could contribute to shortages and higher costs for technology-reliant sectors across the country. The strain on electricity supply is a central constraint on the nation's AI and industrial buildout.

Data centers accounted for about 4.4% of U.S. electricity use in 2023 and could reach as much as 12% by 2028. Prediction-market contracts on whether H100 rental prices will exceed set thresholds in March 2027 priced probabilities between 28.5% and 77.5%, and it remains unclear how much those projections will hold.

The details

Construction is booming in the Southeast, Southwest, and Midwest, where new facilities draw on the same electricity supply used by U.S. manufacturing. Analysts project that competition for power could lead to shortages and higher costs for technology-reliant industries, and that H100 rental prices may fall if energy-related operating costs weigh on AI companies.

Timeline

  1. 2023: Data centers consumed about 4.4% of U.S. electricity.

  2. March 2027: H100 rental price threshold contracts measured.

  3. April 1, 2027: H100 rental price contracts scheduled to settle.

  4. 2028: Data centers could reach 12% of U.S. electricity.

The Tech Race

Data centers' projected climb from 4.4% of U.S. electricity in 2023 to as much as 12% by 2028 marks a sharp acceleration in the power demands of the AI buildout. That trajectory now places the sector in direct competition with U.S. factories for the same constrained grid capacity.

Higher electricity costs driven by competition for power could show up in household and business utility bills in affected regions. Technology users may also see changes in the price of AI computing services if H100 rental rates shift.

The takeaway

Electricity supply is becoming a binding constraint on both AI expansion and domestic manufacturing, so grid capacity will shape where and how these industries grow. Watching regional power planning and computing rental prices offers an early read on which side of that competition gains ground.

Further reading

For broader context on how these facilities are reshaping power demand, explore our Data Centers coverage.

Source note: This article includes information reported by TokenPost.

Live Poll

Do you expect your electricity bills to rise as data centers expand?