Administration Extends Jones Act Waiver Through February

The Trump administration extended its Jones Act waiver program for 90 days, while shipments have slowed since the shift to case-by-case review.

Updated on Nov. 26, 2026 in Transportation

Isometric editorial illustration of stacked plain steel shipping containers in a bare coastal yard beside a single cargo crane.
The Trump administration extended its Jones Act waiver program on November 16 through February 14, 2027, after shifting to case-by-case review in August. AI Illustration. Upload story photo >

Live Poll

Should the government keep waiving Jones Act shipping rules for foreign vessels?

The Trump administration extended the Jones Act waiver program on November 16, 2026, through February 14, 2027. Waiver shipments slowed after the administration replaced a blanket waiver with individual review of each request in August.

Why it matters

The waiver was first granted as the closure of the Strait of Hormuz disrupted fuel supplies during the US-Israel war on Iran, and it allows foreign-built or foreign-crewed vessels to move domestic cargo between US ports. Its continued extension affects how fuel moves between US regions.

MARAD has recorded 356 completed waiver movements since March 17, 2026, with 271 of them, about 76%, originating on the Gulf Coast and roughly 94.1 million barrels of crude and products moved. The Cato Institute reported that all 56 Jones Act-compliant US vessels remained fully employed during the waiver period, but the cause of the slowdown in waiver pace is not fully explained in the source.

The players

Trump administration

The executive branch of the US federal government led by President Donald Trump, which issues and extends the Jones Act waivers.

Maritime Administration (MARAD)

The US Department of Transportation agency that tracks and records Jones Act waiver movements and vessel activity.

Cato Institute

A Washington, D.C.-based libertarian think tank that reported on vessel employment during the waiver period.

The details

The administration replaced the blanket suspension with individual review of each waiver request on August 17, 2026, and each approved movement cites a national defense interest justification. The extension covers the period through February 14, 2027.

Timeline

  1. March 17, 2026: Initial Jones Act waiver announced amid the Strait of Hormuz closure.

  2. May 18, 2026: First extension of the waiver granted.

  3. August 17, 2026: Blanket waiver replaced by case-by-case review; second extension issued.

  4. November 16, 2026: Waiver extended 90 days through February 14, 2027.

  5. February 14, 2027: Current waiver extension expires.

Roadmap

The waiver is a temporary departure from the Jones Act of 1920, which has long required domestic waterborne cargo to move on US-built, US-flagged, US-crewed vessels. Its repeated extensions show the administration using a national defense justification to keep foreign-built or foreign-crewed vessels moving fuel between US ports.

Fuel moving between US Gulf and West Coast ports depends on whether the waiver continues, which can affect regional supply and prices. Consumers on the West Coast may feel the effects through fuel availability as shipments continue under case-by-case approval.

The takeaway

The Jones Act waiver's future depends on case-by-case approvals and the February 2027 expiration, so shipment pace on US fuel routes is a useful signal to watch. Readers tracking energy costs should follow whether the administration renews the program.

What happens next

The current waiver extension expires on February 14, 2027, when the administration will need to decide whether to extend it again.

Further reading

Explore more Transportation coverage for context on shipping rules and fuel logistics.

Source note: This article includes information reported by Hellenic Shipping News.

Live Poll

Should the government keep waiving Jones Act shipping rules for foreign vessels?