Korea Zinc Forms Jupiter Solar Recycling Venture
Korea Zinc and SolarCycle will combine solar panel recycling operations in a new joint venture that will refine recovered metals in Tennessee.
Updated on Nov. 23, 2026 in Energy

Live Poll
Should the U.S. require more solar panels to be recycled instead of landfilled?
Korea Zinc agreed to form a joint venture called Jupiter with SolarCycle, one of the top three solar panel recyclers in the U.S. Korea Zinc will hold 70% of Jupiter's voting rights and SolarCycle will hold 30%.
Why it matters
Roughly 90% of U.S. solar waste panels are currently directly landfilled, and California and New York have banned that practice. The venture aims to build recycling capacity that can recover metals from panels as solar waste volumes grow across the country.
IRENA projects annual solar waste panels will reach 500,000 tons by 2028, 1 million tons by 2041 and 3 million tons by 2050. The venture's capacity and cost figures have not been disclosed.
The players
Korea Zinc
Korea Zinc is a South Korean nonferrous metals smelting company that holds the majority stake in the Jupiter venture and is building the Project Crucible smelter in Tennessee.
SolarCycle
SolarCycle is a U.S. solar panel recycler ranked among the top three in the country, known for its nationwide network for collecting waste panels.
International Renewable Energy Agency (IRENA)
IRENA is an intergovernmental organization based in Abu Dhabi that publishes global renewable energy data and projections, including forecasts for solar panel waste.
The details
Jupiter will be formed by Korea Zinc's U.S. subsidiary PedalPoint contributing its stake in e-waste recycler Evtera, while SolarCycle contributes its business division as an in-kind investment. The partnership will refine recovered solar panel metals at Project Crucible in Clarksville, Tennessee, where aluminum frames are removed before glass separation and internal cells and metals are then separated.
Timeline
November 23, 2026: Korea Zinc and SolarCycle agreed to form Jupiter.
2029: Korea Zinc's Project Crucible is targeted to begin operation.
2028: IRENA projects annual solar waste panels will reach 500,000 tons.
2041: IRENA projects annual solar waste panels will reach 1 million tons.
2050: IRENA projects annual solar waste panels will reach 3 million tons.
Energy Transition
The Jupiter venture follows California and New York's bans on landfilling solar panels, which have pushed the market toward recycling rather than disposal. Its Tennessee smelter would extend that shift into domestic metal recovery as the U.S. solar fleet ages.
Homeowners and businesses with aging solar systems should check whether their local jurisdiction restricts landfill disposal of panels, since California and New York already prohibit it. Panel owners can ask installers or manufacturers about take-back or recycling options before disposing of retired equipment.
The takeaway
Solar panels typically last 20 to 25 years, so the volume of retired panels will rise sharply over the next two decades. Recycling capacity built now will determine whether that material is recovered or landfilled.
Further reading
For more on the energy sector's growing waste challenges, explore Energy coverage on Wisevoter.
Source note: This article includes information reported by 조선일보.
Live Poll
Should the U.S. require more solar panels to be recycled instead of landfilled?






