Zeno Power Tests Seabed Nuclear Battery Generator

The company ran a heat-powered Stirling generator on the seabed for two weeks, with a fueled deployment planned for 2027.

Updated on Nov. 22, 2026 in Nuclear

Bold flat-color editorial illustration of a cylindrical engine housing resting on a seabed frame, evoking undersea power engineering.
Zeno Power ran a heat-powered Stirling generator on the seabed off Washington for two weeks, producing over 20 watts while a fueled version is slated for 2027. AI Illustration. Upload story photo >

Live Poll

Do you think nuclear power sources on the seabed are worth the risks?

Zeno Power ran its electrically heated Stirling generator on the seabed for two weeks in a controlled maritime setting in Washington state, producing more than 20 watts of electrical power. No nuclear material was involved in the test, which used an electric heating element in place of a radioisotope heat source.

Why it matters

The demonstration tests the core engineering of a seabed power system intended to supply decentralized power nodes under the Pentagon-backed DEPTHS program. It is a step toward fueled maritime systems, which the company plans to deploy in 2027.

The company reported more than 20 watts of electrical output over two weeks of seabed operation, with the system recovered afterward. The fueled version has not yet been operated at sea, and its radiological demonstration in a controlled tank is still ahead.

The players

Zeno Power

A Seattle-based company developing radioisotope power systems for defense and space applications, with more than 95 employees across three locations.

U.S. Department of Defense

The Pentagon agency that awarded Zeno a $7.5 million contract in 2023 to develop seabed power for the DEPTHS program.

The details

A Stirling engine converts heat into electricity by cycling gas through heating and cooling phases, and in the fueled design the heat would come from a radioisotope instead of an electric heater. The U.S. Department of Defense awarded Zeno a $7.5 million contract in 2023 under the DEPTHS program, which aims to build decentralized seabed power nodes.

Timeline

  1. 1960s through 1980s: The U.S. government used strontium-90 power systems at sea.

  2. 2023: The Department of Defense awarded Zeno a $7.5 million seabed power contract.

  3. Nov. 19, 2026: Zeno announced the completed two-week seabed generator demonstration.

  4. 2027: The first fueled seabed deployment and first systems delivery are planned.

Historical Context

The U.S. government operated strontium-90 power systems at sea from the 1960s through the 1980s, and Zeno's fueled maritime battery now moves that approach toward the DEPTHS program's seabed power nodes. The company's prototype went from final design to open-water testing in less than 16 months.

If the fueled version works at sea, it could provide a steady, long-running power source for remote seabed equipment that currently depends on batteries or cables. The timeline puts first deliveries in 2027, but the technology has not yet been proven with a radioisotope heat source.

The takeaway

Seabed nuclear power is moving from concept toward testing, but the fueled systems remain a plan rather than a proven capability. Readers should watch the 2027 deployment timeline as the real test of the technology.

What happens next

Zeno plans to begin a radiological demonstration in a controlled tank and to deliver its first systems in 2027.

Further reading

Explore more nuclear power news to see how maritime and space reactors are advancing.

Source note: This article includes information reported by Teknoloji Haberleri - ShiftDelete.Net.

Live Poll

Do you think nuclear power sources on the seabed are worth the risks?