Navanex Delivers Dredging Barge to Dragage IM

The steel barge was built by Soudure Techn'Îles for service in the Magdalen Islands' harbours.

Updated on Nov. 24, 2026 in Business

Steel dredging barge with a yellow excavator arm moored at a concrete harbour quay, low islands and grey sea beyond under flat overcast light.
Navanex confirmed delivery of a new dredging barge to Dragage IM, a subsidiary of the Coopérative de Transport Maritime et Aérien, to serve the Magdalen Islands' harbours. AI Illustration. Upload story photo >

Navanex confirmed delivery of a new non-self-propelled dredging barge to Dragage IM, a subsidiary of the Coopérative de Transport Maritime et Aérien (CTMA). The barge carries a hydraulic excavator and work-site supplies and was built by Soudure Techn'Îles in the Gulf of Saint Lawrence off Quebec.

Why it matters

The Magdalen Islands' harbours are subject to recurrent sand infill driven by waves, currents and natural sediment transport, which can quickly reduce available depths in channels and basins. The new barge adds dredging capacity to CTMA's local fleet serving the islands' ports.

The barge measures 24 metres long, 11.2 metres across the beam and draws 0.9 metres, with a steel hull and aluminium superstructure. The announcement does not give its cost or the date it will enter service.

The players

Coopérative de Transport Maritime et Aérien (CTMA)

CTMA is a Quebec cooperative that operates maritime and air transport services, including a dredging and towing division serving the Magdalen Islands' ports.

Dragage IM

Dragage IM is a dredging subsidiary of CTMA that provides towing and berthing assistance and dredging services in the Magdalen Islands.

The details

Navanex adapted the barge's design to the fabrication capabilities of Soudure Techn'Îles from the early stages of development. The integrated wheelhouse supervises dredging activity, while a machinery compartment holds spare parts and tools; the barge also has its own parts store.

Timeline

  1. January 25, 2025: Design contract announced, with first module fabrication already under way.

  2. 2014: CTMA handed over its first newbuild carrier barge.

  3. November 24, 2026: Navanex confirmed delivery of the dredging barge.

Roadmap

The delivery continues CTMA's practice of commissioning purpose-built vessels, following the handover of its first newbuild carrier barge in 2014. Building the dredging barge around a local island shipyard's capabilities extends that approach to harbour maintenance for the Magdalen Islands.

Mariners and port users in the Magdalen Islands may see improved channel and basin maintenance as the barge enters service. The announcement does not specify when dredging operations will begin or which harbours will be served first.

The takeaway

Purpose-built dredging equipment can help keep island harbours navigable as natural sand infill continues to reduce depths. Port users should watch for service announcements from CTMA as the barge begins operations.

Further reading

For related coverage, browse Transportation news across Quebec.

Source note: This article includes information reported by Baird Maritime.