Global Battery Materials Tests Electric Haul Truck
A weeklong real-world trial at its Kearney Graphite Mine will inform the company's planned 2028 restart.
Updated on Nov. 23, 2026 in Electric Vehicles

Global Battery Materials has launched a battery-electric haul truck test study at its Kearney Graphite Mine in Ontario. The study pairs digital modelling with a weeklong real-world trial of a 22-tonne payload vocational haul truck.
Why it matters
The trial lets the company test electrification before investing in the mine's restart, which is being pursued as demand for its graphite exceeds the mine's current production capacity. For Ontario, the study offers a field-tested look at how electric haulage could function at a northern mining site.
The vocational haul truck has a 22-tonne payload capacity and was run through real-world haulage duty cycles at Kearney. Energy consumption and charging requirements remain unreported pending the case study.
The players
Global Battery Materials
Global Battery Materials is the company operating the Kearney Graphite Mine in Ontario and is pursuing its restart to meet graphite demand.
MEDATech Engineering
MEDATech Engineering is the firm leading the study and providing the vocational haul truck used in the trial.
Green Graphite Technologies
Green Graphite Technologies is the organization supporting the study alongside MEDATech Engineering.
Natural Resources Canada
Natural Resources Canada is the federal department whose Energy Innovation Program funds the study.
The details
The study is led by MEDATech Engineering, supported by Green Graphite Technologies and funded by Natural Resources Canada's Energy Innovation Program. Field data from the site is being used to correlate and validate the digital models.
Timeline
November 23, 2026: Launch of the battery-electric haul truck test study announced.
2028: Target year for full restart of the Kearney mine.
Roadmap
The trial is a single-site test of battery-electric haulage at a Canadian graphite mine, tied to federal energy innovation funding. It sits within the broader push to electrify heavy off-road mining equipment ahead of the mine's planned 2028 restart.
For now, the trial's findings on energy consumption and charging requirements have not been published, so the practical cost and infrastructure needs of electric haul trucks remain unclear. Readers following electric vehicle adoption in heavy industry should watch for the case study's results.
The takeaway
Electrifying heavy haulage is being tested under real mining conditions before major capital is committed. The published case study will show whether battery-electric trucks can match the demands of northern mining work.
What happens next
MEDATech Engineering will publish a case study outlining the truck's performance, energy consumption and charging requirements, and Global Battery Materials is working toward a full restart of the Kearney mine by 2028.
Further reading
For broader context on electrified vehicle developments, explore Electric Vehicles coverage.
Source note: This article includes information reported by Canadian Manufacturing.






