High Tide Reports Fourth Set of Labrador West Drill Results
The final 2026 assays from the Labrador West Iron Project show high-grade iron intercepts across multiple drill holes.
Updated on Nov. 18, 2026 in Employment

High Tide Resources released the fourth and final set of 2026 drill assay results from its Labrador West Iron Project on November 18, 2026. The results include Hole 26LB0089, which intersected 33.8% total iron over 117.35 metres.
Why it matters
The results support an updated mineral resource estimate with greater confidence in the continuity and distribution of mineralization at the project. The news comes as governments have jointly committed funding to power and transmission infrastructure in the Labrador West region.
Hole 26LB0089 returned 33.8% total iron over 117.35 metres, and the 27-hole summer program totalled 6,335 metres of core. An updated resource estimate has not yet been completed.
The players
High Tide Resources
High Tide Resources is the company developing the Labrador West Iron Project in Labrador City, Newfoundland and Labrador.
Iron Ore Company of Canada
Iron Ore Company of Canada operates the Carol Lake Mine complex adjacent to the High Tide project area.
Rio Tinto
Rio Tinto is the global mining group that owns a majority stake in Iron Ore Company of Canada.
The details
The 2026 summer program comprised 27 vertical holes of HQ and NQ core drilled at the Labrador West Iron Project, located 20 kilometres northeast of and adjacent to the Carol Lake Mine complex of Iron Ore Company of Canada. Estimated true widths are 80 to 90 per cent of core length.
Timeline
April 6, 2023: Technical report dated for the project's NI 43-101 inferred mineral resource.
Summer 2026: 27-hole drill campaign completed at Labrador West.
July 21, 2026: Governments jointly announced a power and transmission agreement.
November 18, 2026: Fourth and final assay results released by High Tide.
Market Landscape
The project sits next to the Carol Lake Mine complex, which feeds the regional railway with capacity of 80 million tonnes per year to the deep-water port of Sept-Îles, Quebec. High Tide's expansion of drilling in this established district tests whether additional iron ore supply can be developed on existing infrastructure.
For Labrador West residents, sustained mineral exploration can support mining employment and related local contracting if the project advances toward production. The timeline for any construction or hiring depends on further resource work and financing not yet announced.
The takeaway
Investors and residents should watch for the updated mineral resource estimate, which will show whether the high-grade intercepts translate into a larger, more confident resource. Progress on transmission and power infrastructure will also determine how quickly the district can move toward development.
Further reading
Explore more Employment coverage for Newfoundland and Labrador to see how resource development is shaping local jobs.
Source note: This article includes information reported by Metal.






