Alberta to Restart Gull Lake Diversion in 2027

The province plans to resume pumping Blindman River water into the record-low lake after installing a filtration system to block invasive carp.

Updated on Nov. 25, 2026 in Environmental

Alberta to Restart Gull Lake Diversion in 2027

Live Poll

Should the province spend public money to restore Gull Lake's water level?

The Alberta government plans to restart the Blindman River diversion into Gull Lake in 2027, with a new filtration system designed to keep Prussian carp out. Gull Lake's level has dropped about 20 centimetres a year over the past five years to reach record lows.

Why it matters

The lake sits about 1.25 metres below its optimum level, and the diversion has been suspended since 2018 over the presence of Prussian carp in the river. Warm, dry, windy summers typically remove more water than rain and snowmelt replace, leaving the lake without a natural recovery.

The provincially funded diversion improvements total $1.6 million, and the lake averages 5.4 metres in depth across a surface area of more than 80 square kilometres exposed to evaporation. Whether the Blindman River will carry enough flow to make the restart possible in 2027 has not yet been determined.

The players

Alberta Environment and Parks

The Alberta provincial ministry responsible for managing the province's water resources, which suspended the Gull Lake diversion licence in 2018.

Gull Lake Watershed Society

A local watershed organization exploring pumping water from the Haynes Aquifer to raise Gull Lake's level.

The details

The new system will include sensors, remote monitoring, alarms and automatic shutdown procedures, along with a pressurized filtration system to keep Prussian carp and their eggs out of the lake. Agriculture and Irrigation has applied to amend the water licence to allow the filtration installation, and the Gull Lake Watershed Society is also exploring pumping water from the Haynes Aquifer, which is estimated to hold 15 billion cubic metres of freshwater.

Timeline

  1. 1977: Blindman River diversion into Gull Lake begins operating.

  2. 2011: Diversion stops when the lake reaches its high-water target.

  3. 2016: Prussian carp are discovered in the Blindman River.

  4. 2018: Alberta Environment and Parks suspends the system's water licence.

  5. 2027: Diversion may restart if the Blindman River runs high enough.

Season Trajectory

The restart would revive a diversion that operated from 1977 to 2011 and was halted in 2018 over invasive fish, a pattern that shows how water-level management in the province is shaped by both drought and aquatic-species risks. Whether the filtration approach holds up will determine if similar diversions can be reconsidered elsewhere in Alberta.

Lakeside residents and visitors at Aspen Beach Provincial Park, which draws about 150,000 visitors a year, depend on the lake's water level for recreation. The restart and filtration system will determine whether the lake recovers enough to support those uses.

The takeaway

Long-term lake recovery depends on managing both water supply and invasive species, not on pumping alone. Watch for spring filtration testing results to see whether the restart is likely to proceed.

What happens next

Filtration testing for the new system is expected in the spring, and the diversion may restart in 2027 if the Blindman River runs high enough.

Further reading

For more on water and habitat issues across the province, see Environmental coverage on Wisevoter.

Source note: This article includes information reported by Penticton Herald.

Live Poll

Should the province spend public money to restore Gull Lake's water level?