Ventura Offshore Posts $12.6M Q3 Net Loss
The Oslo-listed driller's third-quarter 2026 results reflect two rigs idle in Rio de Janeiro after Brazilian contracts ended.
Updated on Nov. 27, 2026 in Public Companies

Ventura Offshore Holding reported a net loss of $12.6 million for the third quarter of 2026, with adjusted EBITDA falling to $2.1 million from $21.9 million in the second quarter. The company's two Brazil-contracted rigs stopped operating in July and September and are now moored in Guanabara Bay for inspections and overhauls.
Why it matters
The swing from a $20.4 million second-quarter net income to a third-quarter loss shows how idle rigs weigh on earnings between contracts. Ventura's planned Petrobras contract starts in January 2027 and its pending combination with SED Energy Holdings will determine whether the company's fleet returns to steady earnings.
Ventura's operational uptime across owned and managed rigs was 98 per cent, and financial uptime was 93.9 per cent, while $34.2 million had been spent on the two idle rigs as of September 30. Capex for the two rigs is expected to run about 10 per cent above April guidance of $150-156 million, and the stub does not detail how that overrun will be funded.
The players
Ventura Offshore Holding
Ventura Offshore Holding is an offshore drilling company listed on the Oslo exchange that owns and manages drilling rigs for oil and gas clients.
The details
Both SSV Victoria and DS Carolina completed their Brazilian contracts, stopping operations on July 7 and September 7, 2026, respectively, and are now moored in Guanabara Bay in Rio de Janeiro for class inspections, maintenance and overhauls. SSV Victoria is also receiving managed pressure drilling equipment as it prepares for its next assignment.
Timeline
July 7, 2026: SSV Victoria stopped operating after its Brazilian contract.
September 7, 2026: DS Carolina stopped operating after its Brazilian contract.
September 30, 2026: Ventura had spent $34.2 million on the two rigs.
December 2026: SSV Catarina is expected to finish its final well for Eni Indonesia.
January 2027: Petrobras contracts for SSV Victoria and DS Carolina are expected to begin.
Market Landscape
Ventura's dependence on Petrobras contracts for its Brazilian rigs makes its earnings sensitive to the timing of new awards and the gaps between them. The planned January 2027 start for both the SSV Victoria extension and the DS Carolina contract would return those rigs to the Brazilian pattern that generated its nine-month 2026 income.
For investors holding Ventura shares, the quarter's loss and the timing of the next Petrobras starts are the key dates to track against the expected return of the two idle rigs. The combination with SED Energy Holdings, expected in the first quarter of 2027, could change the company's share structure for existing holders.
The takeaway
Ventura's results show that a driller's earnings depend heavily on keeping rigs under contract, so the January 2027 Petrobras starts are the most important near-term marker for the company's recovery.
What happens next
Ventura expects its all-share combination with SED Energy Holdings to complete in the first quarter of 2027, and the Petrobras contracts for SSV Victoria and DS Carolina are expected to begin in January 2027.
Further reading
For more on how listed drillers report earnings and fleet utilization, see the Public Companies section.
Source note: This article includes information reported by Baird Maritime.



