Minesto Unveils T-Dragon Tidal Energy System

The new configuration targets shallow tidal sites that incumbent technologies have struggled to serve competitively.

Updated on Nov. 26, 2026 in Energy

Bold flat-color editorial illustration of a kite-shaped underwater turbine wing tethered to the seabed in fast-moving tidal water, with teal current lines on a navy field.
Swedish developer Minesto unveiled a T-Dragon tidal energy system designed for sites as shallow as 25 to 30 meters and signed a development deal in the Maldives with Morteza Capital. AI Illustration. Upload story photo >

Swedish developer Minesto unveiled a T-Dragon configuration of its Dragon tidal energy technology, designed for water depths as shallow as 25-30 meters and tidal flow speeds of up to 5 m/s. The company also entered a memorandum of understanding with Morteza Capital to develop tidal energy in the Maldives.

Why it matters

The number of industry actors offering mature seabed-mounted horizontal-axis tidal turbines has reportedly fallen from around 20 to fewer than five, leaving fewer options for developers. Minesto says the T-Dragon addresses sites where developers have already invested in site assessments and permitting but incumbent technologies have not proven competitive.

Minesto reports the T-Dragon operates in water depths of 25-30 meters and tidal flows up to 5 m/s, developed over three years and verified through ocean trials. The announcement does not yet specify project timelines or independent performance data.

The players

Minesto

A Swedish developer of tidal energy technology known for its Dragon underwater kite-style generator.

Morteza Capital

An investment and development firm focused on the Maldives and the wider Indian Ocean region.

The details

The T-Dragon builds on Minesto's existing Dragon platform and subsystems, retaining its low-cost and efficient installation characteristics. The company's memorandum with Morteza Capital, an investment and development firm focused on the Maldives and Indian Ocean, targets tidal energy development in that region.

Timeline

  1. Over the past three years, Minesto developed the T-Dragon concept and verified it through ocean trials.

  2. On November 26, 2026, Minesto announced the T-Dragon configuration.

Season Trajectory

The contraction of seabed-mounted horizontal-axis tidal turbine suppliers from around 20 to fewer than five leaves developers with narrowing technology choices. Minesto's T-Dragon enters that consolidating field as a shallow-water alternative aimed at sites that incumbent designs have not served competitively.

Developers evaluating tidal sites in shallow water may find the T-Dragon's 25-30 meter operating depth relevant to permitting and assessment plans already underway. Whether the design becomes commercially available depends on deployment timelines the company has not yet disclosed.

The takeaway

Tidal energy's path to scale may depend as much on the number of available technology suppliers as on raw resource potential. Watching whether the T-Dragon moves from ocean trials to contracted projects will show whether shallow-water tidal sites become viable.

Further reading

Explore more Energy coverage for context on how tidal and marine power fits into the wider clean-energy transition.

Source note: This article includes information reported by Offshore-energy.