REV Exploration Flows Helium Gas at Aden Dome
The maiden well at the Montana-Alberta border tested helium concentrations averaging 0.93% in produced gas.
Updated on Nov. 24, 2026 in Oil and Gas

Live Poll
Should the U.S. government spend more to secure domestic supplies of critical materials like helium?
REV Exploration Corp. flowed helium-bearing gas to surface at its 100%-owned Aden Dome well along the Montana-Alberta border, with peak raw gas rates up to 4.88 million cubic feet per day. Independent laboratory analysis by AGAT Laboratories confirmed an average helium concentration of 0.93% in the produced gas.
Why it matters
The U.S. Department of Energy designated helium a critical material in late October 2026, placing domestic supply projects under closer scrutiny. The results suggest a potential new source of helium supply in the Northern Great Plains, though commercial viability depends on further testing and development.
The 0.93% average helium concentration sits well above the 0.30% generally accepted economic threshold, based on independent AGAT Laboratories analysis. Only 2 of 6.5 meters of the reservoir interval have been perforated, so the full output of the formation remains untested.
The players
REV Exploration Corp.
A Kelowna, British Columbia-based oil and gas exploration company that holds 10,600 acres of Montana oil and gas leasehold interests and is developing the Aden Dome and West Butte projects.
U.S. Department of Energy
The federal agency that designated helium a critical material in late October 2026, a classification that can shape domestic supply policy and investment.
AGAT Laboratories
An independent laboratory that confirmed the 0.93% helium concentration in the Aden Dome produced gas.
The details
REV stimulated the reservoir interval with 15% HCL before flow testing across multiple choke sizes, including a 40/64-inch choke at the peak rate. Wellhead pressure rose from zero to approximately 1,354 psi within 15 minutes of perforation, and no formation water was produced during flow periods.
Timeline
Late October 2026: The U.S. Department of Energy designated helium a critical material.
November 24, 2026: REV announced initial Aden Dome flow test results.
Coming weeks and months: The company plans to scale up helium discovery and development.
Roadmap
The Aden Dome flow test follows the U.S. Department of Energy's late October 2026 designation of helium as a critical material, which elevated domestic helium supply to a federal priority. The result adds a new Northern Great Plains prospect to the search for helium sources outside traditional producing regions.
For readers tracking helium prices and supply, a new domestic source could eventually ease tightness in a commodity used in medical imaging, semiconductor manufacturing and aerospace. Any effect on availability or cost remains years away, pending further testing and commercial development.
The takeaway
Helium supply is shaped by a small number of producing regions, so a verified new source matters even at early stages. Readers should watch for the company's follow-up perforations and delineation drilling to judge whether the Aden Dome flow rates hold over time.
What happens next
REV plans to complete additional perforations at Aden very soon and to drill a nearby delineation well, with Aden results to be used alongside proprietary 3D seismic to rank drilling targets at West Butte.
Further reading
For broader context on resource development, explore more Oil and Gas coverage.
Source note: This article includes information reported by The Manila times.
Live Poll
Should the U.S. government spend more to secure domestic supplies of critical materials like helium?



