Shipyard Wins Order for Two LNG Dual-Fuel Carriers
CSSC Guangzhou Shipyard International will build two 7,000-unit LNG dual-fuel PCTCs for Singapore Shipping Corporation.
Updated on Nov. 24, 2026 in Transportation

CSSC Guangzhou Shipyard International signed a newbuilding contract with Singapore Shipping Corporation for two LNG dual-fuel PCTCs, each with a capacity of 7,000 units. The contract is the maiden cooperation between the two companies.
Why it matters
The vessels are designed with greater fuel flexibility and improved emissions performance compared with conventional oil-fueled ships, aligning with the global decarbonisation trajectory for the maritime sector. The order is part of Singapore Shipping Corporation's major fleet renewal programme.
The contract covers two vessels of 7,000 units each, with delivery scheduled for 2031. Financial terms and the contract value were not disclosed in the available details.
The players
CSSC Guangzhou Shipyard International
CSSC Guangzhou Shipyard International is a shipbuilder in Guangzhou, China, that builds dual-fuel and other commercial vessels and is part of the China State Shipbuilding Corporation group.
Singapore Shipping Corporation
Singapore Shipping Corporation is a Singapore-based shipowner that has specialized in PCTC ownership and leasing for 18 years.
The details
CSSC Trading participated in the contract alongside CSSC Guangzhou Shipyard International, which holds a track record in cumulative order intake and deliveries of dual-fuel PCTCs. The vessels use LNG dual-fuel propulsion systems intended to lower emissions relative to oil-fueled ships.
Timeline
2031: Scheduled delivery of both PCTCs.
Transportation Shift
The order extends LNG dual-fuel propulsion, a technology increasingly specified for newbuild car carriers, into the PCTC segment. It reflects the shipping industry's move away from conventional oil-fueled tonnage as operators renew fleets under decarbonisation pressure.
For shippers and cargo owners, fleet renewal with dual-fuel vessels may influence future car-carrier capacity and fuel-related surcharges. The 2031 delivery date means any effect on freight rates is a longer-term consideration.
The takeaway
Dual-fuel newbuilds like these are becoming a standard specification in shipping, so buyers and operators watching emissions rules should track delivery schedules and fleet renewals. Shipowners' long lead times mean capacity changes arrive years after contracts are signed.
Further reading
Explore more Transportation coverage on Wisevoter for the broader context of this order.
Source note: This article includes information reported by Seatrade Maritime.



