Estrella Drills 827m for Manganese at Laleno
Eight reverse circulation holes at Timor-Leste's Laleno Dome intersected a 19-metre zone of manganese-bearing rock, as the company readies its first export shipment.
Updated on Nov. 24, 2026 in Industry — General

Estrella Resources completed eight reverse circulation holes totalling 827m at Laleno Dome in Timor-Leste, intersecting a 19-metre zone of visually identified manganese-bearing rock. The company has also readied its Tenu Barge Transhipment Facility for a first manganese export shipment.
Why it matters
Management believes the manganese oxides explain a geophysical anomaly that was tested by drilling, giving the company a physical explanation for the target. The planned seaborne shipment will also test the joint venture's customer acceptance, export economics and logistics.
Eight holes totalling 827m and a 19-metre manganese zone were logged visually, with 27,263 tonnes earmarked for shipment at an estimated 29.69 per cent manganese. Laboratory assays from Jakarta, due in early 2027, will confirm or revise these field estimates.
The players
Estrella Resources
Estrella Resources is the exploration company conducting the drilling and export preparations at Laleno Dome and Tenu in Timor-Leste, holding a 70 per cent stake in the joint venture.
Repusource
Repusource is the buyer under a binding sale of 27,000 tonnes of ore from the joint venture at market rates.
The details
Drilling tested a shallow-dipping anomaly picked up by a drone-borne magnetotelluric survey at the 10km-wide dome in Lautém municipality. The Tenu facility includes a limestone rockfill marine loading causeway, barge access and segregated stockpiles, and four trucks carrying 108 tonnes of high-grade material are heading overland to West Timor, Indonesia.
Timeline
November 18, 2026: Ministerial approval granted for the Tenu Barge Transhipment Facility.
First week of January 2027: Initial assay results expected from Jakarta.
2027: Drilling will continue with further RC and diamond holes testing prospects.
Market Landscape
Estrella's first seaborne manganese shipment builds directly on the 29,905 tonnes already hauled from its Ira Miri stage one pit, extending the company from domestic production into export. The binding sale to Repusource will show whether Timor-Leste manganese can find buyers at market rates against established suppliers in the region.
For investors in Estrella Resources, the coming assays will determine whether the visual manganese estimates hold up and whether the first 27,000-tonne sale proceeds as planned. For the wider market, the outcome will indicate whether Timor-Leste can supply manganese to regional buyers on commercially viable terms.
The takeaway
Estrella's shipment will test whether a newly drilled manganese zone can move from field logging to commercial sale, a step that depends on assays not yet returned. Investors should watch the January 2027 assay results before drawing conclusions about the Laleno resource.
What happens next
Initial assay results from Jakarta are due in the first week of January 2027, and drilling will roll into 2027 with further RC and diamond holes.
Further reading
For broader context on sector developments, browse Industry — General coverage.
Source note: This article includes information reported by The West Australian.



