AIDAluna Skips Portland for Southampton Stop

The AIDA Cruises ship cancelled its planned November 9 Portland call and went to Southampton instead, continuing its transatlantic voyage.

Updated on Nov. 9, 2026 in Cruises

A large white cruise ship moored at a quay with open grey water beyond, under soft overcast daylight.
AIDAluna skipped its planned November 9 Portland call and went to Southampton instead, continuing its transatlantic cruise toward Bermuda. AI Illustration. Upload story photo >

AIDAluna, operated by AIDA Cruises, was scheduled to visit Portland on November 9, 2026, as part of a 43-night cruise from Hamburg. The ship instead went to Southampton and is now heading toward Hamilton, Bermuda.

Why it matters

Port changes on long cruises affect passengers who booked specific shore excursions and connections tied to published itineraries. The substitution also shows how itineraries on multi-week voyages can shift after publication.

The cruise was published with a 9am arrival and 7pm departure at Portland on November 9, 2026, within a 43-night voyage. The source does not explain why the Portland call was changed to Southampton.

The players

AIDA Cruises

AIDA Cruises is a German cruise line operating in Europe, with a fleet that includes AIDAluna and sister ships such as AIDAsol.

AIDAluna

AIDAluna is a cruise ship built in 2009 and operated by AIDA Cruises, carrying roughly 2,500 passengers.

The details

AIDAluna left Hamburg on November 7 for a 43-night cruise, with Portland set as its first port of call. The ship instead went to Southampton and remains on course for Hamilton, Bermuda, scheduled for November 17 before finishing in Hamburg on December 20.

Timeline

  1. November 7, 2026: AIDAluna departs Hamburg on the 43-night cruise.

  2. November 9, 2026: Scheduled Portland call is replaced by Southampton.

  3. November 17, 2026: Scheduled arrival in Hamilton, Bermuda.

  4. December 20, 2026: Cruise scheduled to end in Hamburg.

Fleet Context

AIDAluna was built in 2009 and operated by AIDA Cruises, which had previously brought sister ship AIDAsol to Portland on May 22, 2026. This change is a one-off substitution rather than a discontinued port.

Passengers booked on AIDAluna's voyage should check their updated itinerary before departure for any changed ports. Those who arranged shore excursions or transfers in Portland should contact the cruise line to confirm what has been rebooked.

The takeaway

Cruise itineraries can change after publication, so travelers should verify port calls close to departure. Confirming the latest schedule with the cruise line can prevent missed excursions and connections.

What happens next

AIDAluna is scheduled to arrive in Hamilton, Bermuda on November 17, 2026, and finish its cruise in Hamburg on December 20, 2026.

Further reading

For more on how ships plan and adjust their routes, browse the Cruises section.

Source note: This article includes information reported by Dorset Echo.