EU Prioritized Genoa-Ventimiglia Railway Corridor
The European Commission has officially included the crucial cross-border rail link in its list of priority infrastructure projects.
Updated on Oct. 13, 2026 in Europe

Live Poll
Should the European Union prioritize funding for cross-border regional railway connections?
The European Commission has designated the 150-kilometre Genoa-Ventimiglia railway as a priority infrastructure project. This move follows a collaborative push by regional authorities from Italy, France, and Spain to secure official support for the trade link.
Why it matters
The rail line serves as a vital trade connection between Italy and southern France, and official priority status aims to resolve long-standing funding challenges that have delayed essential upgrades. Improving this corridor will modernize transit links between the Italian terminus and the existing Mediterranean Corridor network.
The railway stretches nearly 150 kilometres, including a bottleneck single-track section of 30 kilometres between Finale Ligure and Andora. The network currently functions as a southern terminus for the Rhine-Alpine Corridor.
The players
European Commission
The executive branch of the European Union responsible for proposing legislation and implementing decisions.
RFI
Rete Ferroviaria Italiana is the company responsible for the management of the Italian national railway infrastructure.
The details
Regional authorities from Liguria, Provence-Alpes-Côte d'Azur, Occitanie, and Catalonia worked to ensure the route was integrated into EU planning. While the San Lorenzo-Andora section was modernized in 2016, other parts of the line still rely on infrastructure dating back to 1925.
Timeline
1925: The Ventimiglia-Bordighera section upgrade was completed.
2016: The San Lorenzo-Andora section upgrade was completed.
28 September to 1 October 2026: Connecting Europe Days were held.
End of 2026: RFI expects to complete the project authorization process.
2027: The revision of the EU corridor work plans is scheduled.
Travel Outlook
This project integrates the Genoa-Ventimiglia route into the larger Mediterranean Corridor network, bridging the gap between existing links in Spain, France, and Italy. Such initiatives aim to standardize cross-border travel efficiency by replacing antiquated, low-capacity track segments.
Travelers should note that the corridor currently contains bottlenecks like the single-track section between Finale Ligure and Andora that may affect train speed and scheduling. Continued authorization progress and upcoming plan revisions through 2027 indicate that travel conditions on this route remain in a period of transition.
The takeaway
Securing priority status for this rail line is a major step toward resolving the historical underinvestment in cross-border transit between Italy and France. Passengers can expect eventual improvements in frequency and speed once the planned authorizations and infrastructure upgrades conclude.
Further reading
Learn more about the region in our Europe guide.
Source note: This article includes information reported by TrasportoEuropa.
Live Poll
Should the European Union prioritize funding for cross-border regional railway connections?






